switch — Switch PRIME campuses
| Config | config/connectors/switch.yaml |
| Parser | apps/worker/src/connectors/operators1/switch.ts → switch_campus_v1 |
| Kind / priority | operator / 1 |
| License / attribution | Publicly accessible operator pages; factual data only; © Switch, Inc. |
| Cadence | facility pages weekly · newsroom daily · index monthly · sitemap weekly |
What is crawled
- Yoast sitemaps
/page-sitemap.xmland/post-sitemap.xml(148 posts) + RSS/feed/. - Campus pages:
/core/(The Core, Las Vegas),/citadel/(The Citadel, Tahoe Reno),/keep/(The Keep, Atlanta),/pyramid/(The Pyramid, Grand Rapids);/rock/(Austin) is matched if it appears. Market pages/las-vegas/,/tahoe-reno/,/atlanta/,/grand-rapids/,/austin/→index. - Press releases are root-level WordPress posts (
/<slug>/), so they are classified asnewsroomat priority 40 from the post sitemap and the RSS; marketing pages (/ebc/,/brochure/,/l/,/videos/, careers/partnerportal/sustainable-data-centers two-level paths, …) are excluded explicitly and the GenericConnector relevance filter drops anything not about data centers. - robots.txt has no disallows.
Access
Open site, L1 works (0 credits). maxLevel: 4, maxCreditsPerRun: 30.
Fields (method) — server-rendered facts only
The campus pages render their body client-side (the <article> is empty in the HTML), so only two server-rendered sources exist and are used:
<title>/og:title"Switch – The Core Campus, Las Vegas, Nevada" →name"Switch The Core Campus",cityLas Vegas,regionNameNV,countryIso2US. When the title is a slogan instead (Pyramid: "GRAND RAPIDS: Largest, Most Advanced Campus in the Eastern U.S."), the campus/city/state come from the table of the four PRIME campuses published on Switch's own market pages (fallback:switch-campus-tablein provenance).- meta description "Switch's Tier 5 Platinum rated multi-tenant/colocation data center with up to 2.4 million sqft and 315 MW." →
tier"Tier 5 Platinum",plannedPowerMw315 ("up to" = design/full-build figure),buildingSqm222,967 m² (2.4 M sq ft),renewableClaim("The entire campus is powered by 100% green energy." on Pyramid),description. - No address or coordinates on the pages → geo null. Certainty 0.7 (meta-only).
- Key
switch:<slug>;externalIds.switch_slug.
Verification (2026-09-11)
- Discovery: 153 URLs →
facility_pages=4,newsroom=128,index=6, default 15 (two-level marketing paths, now excluded). --urlCore: Las Vegas, NV, US, Tier 5 Platinum, planned 315 MW, 222,967 m² — matches the live meta description.--urlPyramid: Grand Rapids, MI, US, planned 320 MW ("up to 320 megawatts"), 167,226 m² (1.8 M sq ft), "powered by 100% green energy".- All 4 campus pages: 4/4 valid, 0 rejected; Citadel and Keep carry only name/location (their descriptions state no figures). Credits: 0.
Gaps / TODO
- Body content is JS-rendered; a Scrapfly-rendered fetch (30 credits) could expose per-campus specs — not worth it for four pages that change rarely. Revisit if Switch publishes spec pages server-side.