| 2026-05-25 |
S&P 500 universe cached (Wikipedia table) |
team |
done |
| 2026-06 |
SPID release 1: 500 issuers, 153,894 sections, 39,930 mentions, 19,227 projects (gpt-4o-mini) |
team |
done |
| 2026-10-27 |
Extension to Russell 3000 requested; universe = iShares IWV holdings (23 Oct 2026) as proxy — decision: snapshot estimand, no historical membership |
SPB |
done |
| 2026-10-27 |
Distributed build (10 cluster nodes + 1 external gateway); contiguous CIK shards rebalanced after 1 h (interleaving) |
SPB |
done |
| 2026-10-27/28 |
Full LLM extraction of 968,134 new sections (48 workers), ≈ 775 USD total |
SPB (authorised by SPB) |
done |
| 2026-10-28 01:10–06:22 |
OpenAI credit exhaustion → 149,352 ledger rows with 0 mentions removed and re-run; decision: add call_status to the ledger |
SPB |
rows fixed; schema change proposed |
| 2026-10-28 |
Merge, factors, pdb-api redeploy, French methodological report updated, WP 28 draft (English) |
SPB |
done |
| open |
Author order and CRediT confirmation |
all |
pending |
| open |
Annotation study (sample design in WP 28 §8) |
all |
pending |
| open |
Linkage audit; probabilistic linker |
to assign |
pending |
| open |
Amount typing pass; 8-K exhibit ingestion; recall test on long MD&A |
to assign |
pending |
| open |
Licensed Russell constituent history? |
to assign |
pending |
| 2026-11-03 |
Peer review of v1.0 opened (UQO-WP-REVIEW, branch review-20261103, baseline tag review-baseline-20261103 = 678d233); seven blinded referee reports, 125 items |
review committee |
done |
| 2026-11-05 |
Chief Editor consolidation: major revision; integrity PASS; clusters A–N; constraint: no new LLM call, DuckDB read-only |
review committee |
done |
| 2026-11-05 |
Stage D node audits on M3U96b (read-only, seed 20261105): ledger/calls reconciliation (N1), grounding of all 308,065 mentions (N2), resolver composition and specification curve (N3), two runs / two segmenters (N4), focus-window coverage (N5), financing false-positive classes (N6), 8-K item-code consistency (N7), rules-vs-LLM baseline (N8), time series with fixed cohort (N9), universe artefacts with SHA-256 (N10), annotation frame and protocol — no labels (N11), environment lock (N12), export regeneration (N13) |
node executor |
done |
| 2026-11-05 |
Stage D laptop batches: generators de-literalised and inline-number macros (L1), 24 DOI-verified references and bloom2021 → kalyani2025 (L4), Russell 3000 coverage 85.3 % (L5), replication package with tests, run_all.sh, DAS draft (L6) |
laptop executor |
done |
| 2026-11-05 |
Stage E: manuscript rewritten to the audited facts (v1.1): abstract, §1–§10 and appendices; amount_raw, ledger/calls, "schema-constrained", "not mechanically checkable", "reproducible end to end", "single extraction contract" corrected; project count reported as a range; cohort/run confound; gates (a) partial, (d) and (g) not met; exhibits rebuilt from results/ |
Stage E agents |
done |
| 2026-11-05 |
Decisions pending (authors): AD-1 release of the derived tables; AD-2 human annotation of the frame (n = 1,677 + 385); AD-3 licence (MIT / CC BY 4.0 proposed); AR-LLM-1..3 stability / re-submission / amount-typing calls; AR-LLM-4 re-submission of the suspect post-outage batch (≈ 2,686 calls); deterministic tie-breaker in resolve.py; extraction_runs / call_status schema; confirm the name of the research-design specification ("the brief") |
all |
pending |