{
  "url": "https://www.nextdc.com/data-centres/perth-data-centres/p2-perth",
  "documentId": "doc_10f36a288aedf0b3",
  "fetchedAt": "2026-09-11T08:31:56.476Z",
  "contentType": "text/html; charset=UTF-8",
  "note": "Same stat block as B2 but '20MW+ IT Capacity': the trailing '+' (an 'at least' figure) is accepted by the stat regex since 2026-09-12 and parsed as the stated 20 MW. 12,000 m², 6,300 racks, Tier IV.",
  "counts": {
    "facility": 1
  },
  "facilities": [
    {
      "key": "nextdc:p2",
      "name": "NEXTDC P2 Perth",
      "operatorName": "NEXTDC",
      "city": "Perth",
      "countryIso2": "AU",
      "itCapacityMw": 20,
      "buildingSqm": 12000,
      "rackCount": 6300,
      "tier": "Tier IV"
    }
  ]
}
