# The Corporate Project Economy — Research Project An end-to-end empirical research project built on the **SPID** database (19,227 projects / 39,930 mentions extracted from 153,894 SEC filing sections, 500 firms, 2010–2026). It runs a full battery of econometric / statistical analyses and produces a 30-page LaTeX paper with figures and tables. ## Layout ``` research/ code/ numbered analysis scripts (01..10) + common.py data/ derived datasets (projects/mentions/panel/kg/embeddings .parquet) figures/ publication figures (.pdf + .png) tables/ LaTeX table fragments (\input-ed by the paper) results/ machine-readable results (.json) per analysis paper/ main.tex -> main.pdf (30 pages) ``` ## Reproduce ```bash PY=../../.venv/bin/python # from research/code/ $PY 01_build_datasets.py # build datasets from spid.duckdb $PY 02_descriptives.py # figs + summary/type/sector tables $PY 03_count_models.py # Poisson / NegBin FE count models $PY 04_amount_models.py # hedonic log-capital regressions $PY 05_diffusion.py # AI logit + logistic S-curve $PY 06_did_event_study.py # COVID-19 difference-in-differences $PY 07_survival.py # Kaplan-Meier + Cox PH $PY 08_network.py # KG degree dist + tech communities $PY 09_embeddings.py # KMeans + t-SNE on 384-d embeddings $PY 10_ml_prediction.py # gradient-boosted mega-project classifier cd ../paper && latexmk -pdf main.tex ``` ## Methods used PPML (Poisson) & negative-binomial fixed-effects count models; hedonic OLS with firm/year FE and clustered SE; logistic regression + nonlinear (logistic S-curve) diffusion fitting; dynamic difference-in-differences event study with parallel-trends test; Kaplan–Meier and Cox proportional-hazards survival models; network community detection (greedy modularity) and eigenvector centrality; KMeans clustering with silhouette selection and t-SNE; gradient-boosted trees with cross-validated ROC-AUC and permutation importance. ## Headline findings - Strong within-firm persistence of project activity; significant post-2020 level shift. - Large capital premia for physical project families; AI projects are frequent but **not** large. - AI-adoption S-curve inflects in **2023**; AI share of new projects 0.7% (2015) → 4.7% (2025). - Precisely estimated **null** for differential pandemic-driven digitalization (parallel trends hold). - Project lifecycles: M&A ~49 months → digital/AI ~144 months; larger projects complete slower. - Energy-transition technologies are most central in the innovation network (modularity 0.52). - Text-only mega-project classifier: CV AUC **0.743**.