contrast,n_tasks,estimate,ci_low,ci_high,perm_p L-A,24,0.05555555555555556,0.0,0.1527777777777778,0.48865113488651135 B-L,24,-0.041666666666666664,-0.125,0.0,1.0 L rate,24,0.9583333333333334,,,