SPB Git

Repository Public

cost-overview.json 6.9 KB 295 lines json

1{2 "generatedAt": "2026-11-26T05:32:14.001Z",3 "indices": [4  {5   "code": "statcan:18100289:10:1:1",6   "source": "Statistique Canada 18-10-0289-01",7   "geography": "Montréal",8   "buildingType": "Bâtiments résidentiels",9   "division": "Agrégat des divisions",10   "points": [11    {12     "period": "2017-01-01",13     "value": 65.5,14     "pctYoy": null15    },16    {17     "period": "2017-04-01",18     "value": 66.2,19     "pctYoy": null20    },21    {22     "period": "2017-07-01",23     "value": 66.8,24     "pctYoy": null25    },26    "… (39 éléments au total)"27   ],28   "retrievedAt": "2026-11-06T10:15:11.076Z"29  },30  {31   "code": "statcan:18100289:10:1:10",32   "source": "Statistique Canada 18-10-0289-01",33   "geography": "Montréal",34   "buildingType": "Bâtiments résidentiels",35   "division": "Ouvertures et fermetures",36   "points": [37    {38     "period": "2017-01-01",39     "value": 63.2,40     "pctYoy": null41    },42    {43     "period": "2017-04-01",44     "value": 63.7,45     "pctYoy": null46    },47    {48     "period": "2017-07-01",49     "value": 64.2,50     "pctYoy": null51    },52    "… (39 éléments au total)"53   ],54   "retrievedAt": "2026-11-06T10:15:11.076Z"55  },56  {57   "code": "statcan:18100289:10:1:11",58   "source": "Statistique Canada 18-10-0289-01",59   "geography": "Montréal",60   "buildingType": "Bâtiments résidentiels",61   "division": "Revêtements de finition",62   "points": [63    {64     "period": "2017-01-01",65     "value": 65.8,66     "pctYoy": null67    },68    {69     "period": "2017-04-01",70     "value": 67.2,71     "pctYoy": null72    },73    {74     "period": "2017-07-01",75     "value": 68,76     "pctYoy": null77    },78    "… (39 éléments au total)"79   ],80   "retrievedAt": "2026-11-06T10:15:11.076Z"81  },82  "… (38 éléments au total)"83 ],84 "kpis": {85  "residentialIndex": {86   "value": 117.8,87   "period": "2026-07-01",88   "pctYoy": 8.6,89   "geography": "Montréal"90  },91  "materialsProxy": {92   "value": 107.2,93   "period": "2026-07-01",94   "pctYoy": 10.6,95   "label": "Bois, plastiques et composites"96  },97  "labour": {98   "trade": "Charpentier-menuisier",99   "totalEmployerCost": 70.23,100   "effectiveFrom": "2026-04-26",101   "pctYoy": 12.3,102   "source": "APCHQ — Coûts horaires de la main-d'œuvre"103  },104  "observations": 6840,105  "itemsObserved": 132,106  "itemsTotal": 184,107  "lastSync": "2026-11-16T10:38:23.120Z"108 },109 "materials": [110  {111   "itemCode": "LUM-2X4-8",112   "nameFr": "Épinette 2 × 4 × 8 pi (SPF, sec)",113   "nameEn": "SPF 2 × 4 × 8 ft (KD)",114   "unit": "unit",115   "price": 3.79,116   "kind": "observed",117   "sourceCount": 3,118   "observedAt": "2026-11-16",119   "history": [120    {121     "date": "2026-09-07",122     "price": 3.65123    },124    {125     "date": "2026-09-08",126     "price": 3.65127    },128    {129     "date": "2026-09-09",130     "price": 3.78131    },132    "… (40 éléments au total)"133   ]134  },135  {136   "itemCode": "LUM-2X6-8",137   "nameFr": "Épinette 2 × 6 × 8 pi (SPF, sec)",138   "nameEn": "SPF 2 × 6 × 8 ft (KD)",139   "unit": "unit",140   "price": 6.19,141   "kind": "observed",142   "sourceCount": 3,143   "observedAt": "2026-11-16",144   "history": [145    {146     "date": "2026-09-07",147     "price": 5.98148    },149    {150     "date": "2026-09-09",151     "price": 5.98152    },153    {154     "date": "2026-09-10",155     "price": 6.98156    },157    "… (31 éléments au total)"158   ]159  },160  {161   "itemCode": "OSB-7/16-4X8",162   "nameFr": "Panneau OSB 7/16 po 4 × 8 pi",163   "nameEn": "OSB sheathing 7/16 in 4 × 8 ft",164   "unit": "pi2",165   "price": 0.53,166   "kind": "observed",167   "sourceCount": 3,168   "observedAt": "2026-11-14",169   "history": [170    {171     "date": "2026-09-07",172     "price": 0.39173    },174    {175     "date": "2026-09-09",176     "price": 0.37177    },178    {179     "date": "2026-09-12",180     "price": 0.37181    },182    "… (40 éléments au total)"183   ]184  },185  "… (12 éléments au total)"186 ],187 "popularAssemblies": [188  {189   "code": "STR-WALL-2X6-EXT",190   "nameFr": "Mur extérieur ossature 2 × 6 (charpente + revêtement intermédiaire)",191   "nameEn": "Exterior 2 × 6 framed wall (framing + sheathing)",192   "unit": "pi2",193   "direct": 7.14,194   "material": 1.88,195   "labour": 5.27,196   "equipment": 0,197   "observedShare": 1198  },199  {200   "code": "ENV-INSUL-WALL-R24",201   "nameFr": "Isolation de mur R24 + pare-vapeur",202   "nameEn": "Wall insulation R24 + vapour barrier",203   "unit": "pi2",204   "direct": 3.2,205   "material": 2.36,206   "labour": 0.84,207   "equipment": 0,208   "observedShare": 1209  },210  {211   "code": "ENV-SIDING-VINYL",212   "nameFr": "Revêtement de vinyle sur fourrures",213   "nameEn": "Vinyl siding on furring",214   "unit": "pi2",215   "direct": 4.85,216   "material": 1.69,217   "labour": 3.16,218   "equipment": 0,219   "observedShare": 1220  },221  "… (12 éléments au total)"222 ],223 "locations": [224  {225   "code": "QC-ABT",226   "nameFr": "Abitibi-Témiscamingue",227   "nameEn": "Abitibi-Témiscamingue",228   "regionCode": "08",229   "materialFactor": 1.06,230   "labourFactor": 1.02,231   "equipmentFactor": 1.05,232   "overallFactor": 1.042,233   "effectiveDate": "2026-09-01",234   "sourceMethod": "Main-d'œuvre : conventions collectives CCQ uniformes au Québec (APCHQ) ; matériaux/équipement : surcoût de transport — hypothèse Vrai-Prix",235   "confidence": 55236  },237  {238   "code": "QC-BSL",239   "nameFr": "Bas-Saint-Laurent",240   "nameEn": "Lower Saint Lawrence",241   "regionCode": "01",242   "materialFactor": 1.04,243   "labourFactor": 1,244   "equipmentFactor": 1.03,245   "overallFactor": 1.022,246   "effectiveDate": "2026-09-01",247   "sourceMethod": "Main-d'œuvre : conventions collectives CCQ uniformes au Québec (APCHQ) ; matériaux/équipement : surcoût de transport — hypothèse Vrai-Prix",248   "confidence": 75249  },250  {251   "code": "QC-CDN",252   "nameFr": "Côte-Nord",253   "nameEn": "North Shore",254   "regionCode": "09",255   "materialFactor": 1.08,256   "labourFactor": 1.03,257   "equipmentFactor": 1.06,258   "overallFactor": 1.057,259   "effectiveDate": "2026-09-01",260   "sourceMethod": "Main-d'œuvre : conventions collectives CCQ uniformes au Québec (APCHQ) ; matériaux/équipement : surcoût de transport — hypothèse Vrai-Prix",261   "confidence": 55262  },263  "… (16 éléments au total)"264 ],265 "sources": [266  {267   "name": "APCHQ — Coûts horaires de la main-d'œuvre",268   "type": "labour",269   "license": "public_open",270   "lastSync": "2026-11-16T10:19:05.572Z",271   "active": true,272   "observations": 3541,273   "url": "https://www.apchq.com/nos-services/relations-du-travail/paie/couts-horaires-et-paie/"274  },275  {276   "name": "CCQ — Salaires et taux conventionnés",277   "type": "labour",278   "license": "public_open",279   "lastSync": "2026-11-14T10:15:09.890Z",280   "active": true,281   "observations": 0,282   "url": "https://www.ccq.org/fr-CA/avantages-sociaux/salaire-taux"283  },284  {285   "name": "Statistique Canada — Indices des prix de la construction de bâtiments (18-10-0289-01)",286   "type": "index",287   "license": "public_open",288   "lastSync": "2026-11-06T10:15:11.131Z",289   "active": true,290   "observations": 0,291   "url": "https://www150.statcan.gc.ca/t1/tbl1/fr/tv.action?pid=1810028901"292  },293  "… (12 éléments au total)"294 ]295}
Files main
Menu

Theme