TeX 59%
Python 40.8%
1{"status": "ok", "message-type": "work", "message-version": "1.0.0", "message": {"indexed": {"date-parts": [[2026, 7, 15]], "date-time": "2026-07-15T01:30:05Z", "timestamp": 1784079005635, "version": "3.55.0"}, "reference-count": 44, "publisher": "Hindawi Limited", "license": [{"start": {"date-parts": [[2014, 1, 1]], "date-time": "2014-01-01T00:00:00Z", "timestamp": 1388534400000}, "content-version": "unspecified", "delay-in-days": 0, "URL": "http://creativecommons.org/licenses/by/3.0/"}], "funder": [{"name": "Saudi Binladin Constructions Group"}], "content-domain": {"domain": [], "crossmark-restriction": false}, "short-container-title": ["Advances in Civil Engineering"], "published-print": {"date-parts": [[2014]]}, "abstract": "<jats:p>Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.</jats:p>", "DOI": "10.1155/2014/107926", "type": "journal-article", "created": {"date-parts": [[2014, 12, 2]], "date-time": "2014-12-02T21:01:53Z", "timestamp": 1417554113000}, "page": "1-11", "source": "Crossref", "is-referenced-by-count": 56, "title": ["Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey"], "prefix": "10.1155", "volume": "2014", "author": [{"given": "Abdelrahman Osman", "family": "Elfaki", "sequence": "first", "affiliation": [{"name": "University of Tabuk, Tabuk 50060, Saudi Arabia"}, {"name": "Binladen Research Chair on Quality and Productivity Improvement in the Construction Industry, College of Engineering, University of Hail, Saudi Arabia"}], "role": [{"vocabulary": "crossref", "role": "author"}]}, {"given": "Saleh", "family": "Alatawi", "sequence": "additional", "affiliation": [{"name": "University of Tabuk, Tabuk 50060, Saudi Arabia"}, {"name": "Binladen Research Chair on Quality and Productivity Improvement in the Construction Industry, College of Engineering, University of Hail, Saudi Arabia"}], "role": [{"vocabulary": "crossref", "role": "author"}]}, {"given": "Eyad", "family": "Abushandi", "sequence": "additional", "affiliation": [{"name": "University of Tabuk, Tabuk 50060, Saudi Arabia"}, {"name": "Binladen Research Chair on Quality and Productivity Improvement in the Construction Industry, College of Engineering, University of Hail, Saudi Arabia"}], "role": [{"vocabulary": "crossref", "role": "author"}]}], "member": "98", "reference": [{"key": "44", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0733-9364(2004)130:4(586)"}, {"issue": "6", "key": "34", "doi-asserted-by": "crossref", "first-page": "335", "DOI": "10.1061/(ASCE)0887-3801(2008)22:6(335)", "volume": "22", "year": "2008", "journal-title": "Journal of Computing in Civil Engineering"}, {"key": "37", "volume-title": "Computational intelligence and civil engineering-perceived problems and possible solutions", "year": "2003"}, {"key": "23", "year": "2005"}, {"key": "20", "doi-asserted-by": "publisher", "DOI": "10.1016/S1474-0346(03)00017-X"}, {"key": "41", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0742-597X(2009)25:4(221)"}, {"key": "36", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0733-9364(2001)127:3(173)"}, {"key": "4", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0742-597X(1998)14:1(67)"}, {"key": "3", "doi-asserted-by": "publisher", "DOI": "10.1108/JFMPC-06-2013-0027"}, {"key": "33", "doi-asserted-by": "publisher", "DOI": "10.5130/ajceb.v11i4.2195"}, {"key": "17", "doi-asserted-by": "publisher", "DOI": "10.1016/S0360-1323(00)00009-3"}, {"key": "13", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)1076-0431(2001)7:4(115)"}, {"issue": "4", "key": "26", "doi-asserted-by": "crossref", "first-page": "383", "DOI": "10.1080/01446199100000030", "volume": "9", "year": "1991", "journal-title": "Construction Management and Economics"}, {"key": "8", "year": "1988"}, {"key": "18", "volume-title": "Developing benchmarks for project schedule risk estimation", "year": "2003"}, {"key": "19", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0887-3801(1994)8:2(131)"}, {"key": "38", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)CO.1943-7862.0000479"}, {"key": "46", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0733-9364(2005)131:7(765)"}, {"key": "24", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)CO.1943-7862.0000725"}, {"key": "7", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0887-3801(2007)21:4(259)"}, {"key": "22", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2010.02.004"}, {"key": "43", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2012.05.013"}, {"key": "12", "doi-asserted-by": "publisher", "DOI": "10.3846/13923730.2013.801891"}, {"key": "25", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)CO.1943-7862.0000409"}, {"key": "14", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)CO.1943-7862.0000743"}, {"key": "30", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)CP.1943-5487.0000054"}, {"key": "47", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2014.03.010"}, {"key": "32", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2013.10.020"}, {"key": "21", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2012.11.014"}, {"key": "31", "doi-asserted-by": "publisher", "DOI": "10.3846/13923730.2012.737829"}, {"key": "39", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2008.04.002"}, {"key": "6", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2011.09.013"}, {"key": "1", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0733-9364(2009)135:7(668)"}, {"key": "50", "doi-asserted-by": "publisher", "DOI": "10.3846/13923730.2012.704164"}, {"key": "27", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)CP.1943-5487.0000218"}, {"key": "40", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0887-3801(2006)20:3(165)"}, {"key": "29", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2012.04.006"}, {"key": "10", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2013.05.018"}, {"key": "28", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0887-3801(2005)19:2(208)"}, {"key": "48", "doi-asserted-by": "publisher", "DOI": "10.1061/(ASCE)0887-3801(2010)24:1(35)"}, {"key": "45", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2014.02.014"}, {"key": "11", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2008.07.001"}, {"key": "49", "doi-asserted-by": "publisher", "DOI": "10.1016/j.autcon.2010.07.014"}, {"key": "35", "year": "2007"}], "container-title": ["Advances in Civil Engineering"], "original-title": [], "language": "en", "link": [{"URL": "http://downloads.hindawi.com/journals/ace/2014/107926.pdf", "content-type": "application/pdf", "content-version": "vor", "intended-application": "text-mining"}, {"URL": "http://downloads.hindawi.com/journals/ace/2014/107926.xml", "content-type": "application/xml", "content-version": "vor", "intended-application": "text-mining"}, {"URL": "http://downloads.hindawi.com/journals/ace/2014/107926.pdf", "content-type": "unspecified", "content-version": "vor", "intended-application": "similarity-checking"}], "deposited": {"date-parts": [[2017, 6, 23]], "date-time": "2017-06-23T01:21:44Z", "timestamp": 1498180904000}, "score": 1, "resource": {"primary": {"URL": "http://www.hindawi.com/journals/ace/2014/107926/"}}, "subtitle": [], "short-title": [], "issued": {"date-parts": [[2014]]}, "references-count": 44, "alternative-id": ["107926", "107926"], "URL": "https://doi.org/10.1155/2014/107926", "relation": {}, "ISSN": ["1687-8086", "1687-8094"], "issn-type": [{"value": "1687-8086", "type": "print"}, {"value": "1687-8094", "type": "electronic"}], "subject": [], "published": {"date-parts": [[2014]]}}}