SPB Git forge

spb/wp20_uqo

Public
1commits 1branches 0releases
2.8 MBsize
maindefault branch
yesterdaylast push
TeX 59% Python 40.8%
11.1 KB · 1 lines json
Raw Blame History
1{"status": "ok", "message-type": "work", "message-version": "1.0.0", "message": {"indexed": {"date-parts": [[2026, 9, 22]], "date-time": "2026-09-22T08:37:30Z", "timestamp": 1790066250085, "version": "4.0.1"}, "reference-count": 31, "publisher": "Elsevier BV", "issue": "7", "license": [{"start": {"date-parts": [[2004, 10, 1]], "date-time": "2004-10-01T00:00:00Z", "timestamp": 1096588800000}, "content-version": "tdm", "delay-in-days": 0, "URL": "https://www.elsevier.com/tdm/userlicense/1.0/"}], "content-domain": {"domain": [], "crossmark-restriction": false}, "short-container-title": ["International Journal of Project Management"], "published-print": {"date-parts": [[2004, 10]]}, "DOI": "10.1016/j.ijproman.2004.04.002", "type": "journal-article", "created": {"date-parts": [[2004, 5, 11]], "date-time": "2004-05-11T11:49:26Z", "timestamp": 1084276166000}, "page": "595-602", "source": "Crossref", "is-referenced-by-count": 205, "title": ["A neural network approach for early cost estimation of structural systems of buildings"], "prefix": "10.1016", "volume": "22", "author": [{"given": "H", "family": "Murat Günaydın", "sequence": "first", "affiliation": [], "role": [{"vocabulary": "crossref", "role": "author"}]}, {"given": "S", "family": "Zeynep Doğan", "sequence": "additional", "affiliation": [], "role": [{"vocabulary": "crossref", "role": "author"}]}], "member": "78", "reference": [{"issue": "2", "key": "10.1016/j.ijproman.2004.04.002_BIB1", "doi-asserted-by": "crossref", "first-page": "433", "DOI": "10.1016/S0360-8352(97)00141-1", "article-title": "A neural network approach for early cost estimation of packaging products", "volume": "34", "author": "Zhang", "year": "1998", "journal-title": "Comput. Ind. Eng."}, {"issue": "1", "key": "10.1016/j.ijproman.2004.04.002_BIB2", "doi-asserted-by": "crossref", "first-page": "47", "DOI": "10.1016/S0950-0618(96)00030-X", "article-title": "Estimating building materials cost in urban housing construction projects, based on matrix calculation: the case of Cameroon", "volume": "11", "author": "Pettang", "year": "1997", "journal-title": "Constr. Build. Mater."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB3", "doi-asserted-by": "crossref", "first-page": "177", "DOI": "10.1016/S0950-7051(01)00155-1", "article-title": "Knowledge based-system for alternative design, cost estimating and scheduling", "volume": "15", "author": "Mohamed", "year": "2002", "journal-title": "Knowl. Based Syst."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB4", "series-title": "Construction estimates and costs", "author": "Pulver", "year": "1989"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB5", "doi-asserted-by": "crossref", "first-page": "741", "DOI": "10.1016/S0926-5805(00)00091-1", "article-title": "Enhancing multi-disciplinary collaboration through semantically rich presentation", "volume": "10", "author": "Kalay", "year": "2001", "journal-title": "Automat. Constr."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB6", "doi-asserted-by": "crossref", "first-page": "123", "DOI": "10.1016/S0360-1323(00)00081-0", "article-title": "Recourse to earth for low-cost housing in Nigeria", "volume": "37", "author": "Olotuah", "year": "2002", "journal-title": "Build. Environ."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB7", "series-title": "Construction project management", "author": "Gould", "year": "2000"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB8", "unstructured": "Saner C. A Proposal for cost-estimation for structural systems of 4–8 storey residential buildings. MSc Thesis, Istanbul Technical University; 1993"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB9", "unstructured": "State Institute of Statistics, Construction Permits for the Year 2003. Available from: www.die.gov.tr/english/SONIST/INSAAT/050903g.htm; last accessed October 2003"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB10", "series-title": "Neural networks: a comprehensive foundation", "author": "Haykin", "year": "1994"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB11", "doi-asserted-by": "crossref", "first-page": "201", "DOI": "10.1016/S0925-5273(98)00212-6", "article-title": "Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis", "volume": "62", "author": "Shtub", "year": "1999", "journal-title": "Prod. Econ."}, {"issue": "1", "key": "10.1016/j.ijproman.2004.04.002_BIB12", "doi-asserted-by": "crossref", "first-page": "18", "DOI": "10.1061/(ASCE)0733-9364(1998)124:1(18)", "article-title": "Regularization neural network for construction cost estimation", "volume": "124", "author": "Adeli", "year": "1998", "journal-title": "J. Constr. Eng. Manage."}, {"issue": "3", "key": "10.1016/j.ijproman.2004.04.002_BIB13", "doi-asserted-by": "crossref", "first-page": "210", "DOI": "10.1061/(ASCE)0733-9364(1998)124:3(210)", "article-title": "Neural network model for parametric cost estimation of highway projects", "volume": "124", "author": "Hegazy", "year": "1998", "journal-title": "J. Constr. Eng. Manage."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB14", "unstructured": "Harding A, Lowe D, Hickson A, Emsley M, Duff R. Implementation of a neural network model for the comparison of the cost of different procurement approaches. Paper presented to CIB W92 Procurement System Symposium. Santiago, Chile; April 2000. p. 24–7"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB15", "doi-asserted-by": "crossref", "first-page": "465", "DOI": "10.1080/01446190210151050", "article-title": "Data modelling and the application of a neural network approach to the prediction of total construction costs", "volume": "20", "author": "Emsley", "year": "2002", "journal-title": "Constr. Manage. Econ."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB16", "first-page": "19", "article-title": "Preliminary cost estimation of highway construction using neural networks", "volume": "41,3", "author": "Al-Tabtabai", "year": "1999", "journal-title": "Cost Eng."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB17", "unstructured": "Squeira I. Neural Network-Based Cost Estimating, Master's Thesis. Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Quebec, Canada; 1999"}, {"issue": "5", "key": "10.1016/j.ijproman.2004.04.002_BIB18", "first-page": "17", "article-title": "Cost estimation of timber bridges using neural networks", "volume": "37", "author": "Creese", "year": "1995", "journal-title": "Cost Eng."}, {"issue": "1", "key": "10.1016/j.ijproman.2004.04.002_BIB19", "first-page": "25", "article-title": "Neural networks for cost estimation", "volume": "40", "author": "Bode", "year": "1998", "journal-title": "Cost Eng."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB20", "unstructured": "Setyawati BR, Sahirman S, Creese RC. Neural networks for cost estimation. AACE International Transactions; 2002, ABI/INFORM Global: EST.13.1–EST.13.9"}, {"issue": "2", "key": "10.1016/j.ijproman.2004.04.002_BIB21", "doi-asserted-by": "crossref", "first-page": "137", "DOI": "10.1080/00137919708903174", "article-title": "Cost estimation predictive modeling: regression versus neural network", "volume": "42", "author": "Smith", "year": "1997", "journal-title": "Eng. Economist"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB22", "unstructured": "The NeuroDimensions Inc. NeuroSolutions Tool for Excel; 2002"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB23", "doi-asserted-by": "crossref", "first-page": "1541", "DOI": "10.1016/S0045-7949(01)00039-6", "article-title": "Neural network design for engineering applications", "volume": "79", "author": "Rafiq", "year": "2001", "journal-title": "Comput. Struct."}, {"issue": "1", "key": "10.1016/j.ijproman.2004.04.002_BIB24", "doi-asserted-by": "crossref", "first-page": "9", "DOI": "10.1016/S0263-7863(97)00007-0", "article-title": "A neural network application to subcontractor rating in construction firms", "volume": "16", "author": "Albino", "year": "1998", "journal-title": "J. Project Manage."}, {"issue": "3", "key": "10.1016/j.ijproman.2004.04.002_BIB25", "doi-asserted-by": "crossref", "first-page": "243", "DOI": "10.1061/(ASCE)0733-9364(1997)123:3(214)", "article-title": "Model for construction budget performance – a neural network approach", "volume": "123", "author": "Chua", "year": "1997", "journal-title": "J. Constr. Eng. Manage."}, {"issue": "2", "key": "10.1016/j.ijproman.2004.04.002_BIB26", "doi-asserted-by": "crossref", "first-page": "131", "DOI": "10.1061/(ASCE)0887-3801(1994)8:2(131)", "article-title": "Neural networks in civil engineering. I: principles and understanding, and II: systems and application", "volume": "8", "author": "Flood", "year": "1994", "journal-title": "J. Comp. Civil Eng."}, {"issue": "9", "key": "10.1016/j.ijproman.2004.04.002_BIB27", "doi-asserted-by": "crossref", "first-page": "145", "DOI": "10.1111/j.1467-8667.1994.tb00369.x", "article-title": "Developing practical neural network applications using back-propagation", "author": "Hegazy", "year": "1994", "journal-title": "Microcomput. Civil Eng."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB28", "series-title": "Cross-impact analysis of information technologies and project management knowledge areas in the building design process", "author": "Günaydın", "year": "2002"}, {"key": "10.1016/j.ijproman.2004.04.002_BIB29", "doi-asserted-by": "crossref", "first-page": "533", "DOI": "10.1038/323533a0", "article-title": "Learning representations by backpropagation errors", "volume": "323", "author": "Rumelhart", "year": "1986", "journal-title": "Nature"}, {"issue": "3", "key": "10.1016/j.ijproman.2004.04.002_BIB30", "doi-asserted-by": "crossref", "first-page": "4", "DOI": "10.1177/875697280003100302", "article-title": "Modeling the cost of political risk in international construction projects", "volume": "31", "author": "Al-Tabtabai", "year": "2000", "journal-title": "Project Manage. J."}, {"key": "10.1016/j.ijproman.2004.04.002_BIB31", "doi-asserted-by": "crossref", "first-page": "373", "DOI": "10.1016/S1364-0321(01)00006-5", "article-title": "Artificial neural networks in renewable energy systems applications: a review", "volume": "5", "author": "Kalogirou", "year": "2001", "journal-title": "Renew. Sust. Energ. Rev."}], "container-title": ["International Journal of Project Management"], "original-title": [], "language": "en", "link": [{"URL": "https://api.elsevier.com/content/article/PII:S0263786304000389?httpAccept=text/xml", "content-type": "text/xml", "content-version": "vor", "intended-application": "text-mining"}, {"URL": "https://api.elsevier.com/content/article/PII:S0263786304000389?httpAccept=text/plain", "content-type": "text/plain", "content-version": "vor", "intended-application": "text-mining"}], "deposited": {"date-parts": [[2020, 4, 2]], "date-time": "2020-04-02T03:42:06Z", "timestamp": 1585798926000}, "score": 1, "resource": {"primary": {"URL": "https://linkinghub.elsevier.com/retrieve/pii/S0263786304000389"}}, "subtitle": [], "short-title": [], "issued": {"date-parts": [[2004, 10]]}, "references-count": 31, "journal-issue": {"issue": "7", "published-print": {"date-parts": [[2004, 10]]}}, "alternative-id": ["S0263786304000389"], "URL": "https://doi.org/10.1016/j.ijproman.2004.04.002", "relation": {}, "ISSN": ["0263-7863"], "issn-type": [{"value": "0263-7863", "type": "print"}], "subject": [], "published": {"date-parts": [[2004, 10]]}}}