SPB Git

spb/wp29_uqo

Public
465 B · 8 lines markdown
1# Log2- 2026-10-30 P0: read TASK.md, memo, gate_spec; contract written.3- 2026-10-30 P1: audit done, data clean, no exclusions.4- 2026-10-30 P2: baseline iid OLS reproduces memo (p=0.0238).5- 2026-10-30 P3: decision: Andrews AR(1) plug-in bandwidth on slope score -> 8 lags; NW Bartlett no df correction, normal ref. p_hac=0.118.6- 2026-10-30 P4: clean rerun identical; consistency checks pass; gate run.7- 2026-10-30 P5: report and claims written; final gate run.8
Files · 142b688c28c78ba61ec1f5788e17a176c2bbac2a
Menu

Theme