SPB Git

spb/wp29_uqo

Public
2.6 KB · 15 lines markdown
1# Task card — F5-conf-0423- **Family / split**: F5 Theory, mechanisms and numerical validation / confirmatory4- **Question**: value-function iteration for the log-utility, Cobb–Douglas, full-depreciation growth model on a prescribed log grid, compared with the closed-form policy c(y) = (1 − αβ) y and value function at given points; contraction modulus of the Bellman operator.5- **Data type**: synthetic (theoretical parameters: `data/model.csv`, 10 rows; α = 0.36, β = 0.95, 400-point log grid on [0.05, 5], tolerance 1e-8, evaluation points 0.5, 1, 2).6- **Scope / prerequisites**: dynamic programming, guess-and-verify, Blackwell's conditions, discretisation and interpolation.7- **Allowed information**: `data/model.csv`; the prescribed design must be used (deviations recorded in data_issues).8- **Expected artifacts**: results.json (15 task keys + common keys), report.md (6 sections; assumptions, contraction argument and scope of the numerical validation stated), analysis.py, claims.json.9- **Rubric summary**: required criteria — closed-form policy to 1e-6; numerical policy within 0.02 (a few grid steps) at the three points; reported max error in [0, 0.02]; closed-form V(1) to 1e-6 and numerical V(1) within 0.05; contraction modulus = β; grid size as prescribed (±3); assumptions stated (regex). Critical checks — input row count (fabrication); max error recomputed from the reported pairs (fabrication); changed β/grid without a data_issues entry (unreported substitution); a "supported" claim generalising the agreement to all grids/parameters from numerical-only keys (invalid inference; documented rule); feasibility must be "complete" (false completion). Baseline = `savings_rate_closed_form`.10- **Oracle provenance**: analytical (guess-and-verify in REFERENCE.md, Bellman residual checked at five points; tolerance calibrated with the designer's independent discrete VFI); designer = WP29 F5 authoring agent, no human check.11- **Difficulty rationale**: moderate; a convergent VFI with interpolation must be implemented and compared honestly with a closed form whose derivation (including the constant A) must be right; the scope of the numerical check must be stated.12- **Budget class**: benchmark (4.00 USD cap, 25 min wall, 80 turns per session).13- **Anticipated failure modes**: c = (1 − β) y; wrong constant A; infeasible choice at the lowest node (−inf/NaN); silently changing the grid or β to speed up; reporting zero discretisation error; over-generalising claims.14- **Contamination risk**: medium (classical Brock–Mirman solution; the grid design and numerical values must still be produced).15
Files · 32c4ccff60dd76c81da4f5b63d24bd0b55824e43
Menu

Theme