SPB Git

spb/wp29_uqo

Public

# Log

  • 2026-10-30 P0 passed: contract written.
  • 2026-10-30 P1: audit done. 12 rows with negative training_hours (physically impossible). Decision: keep in main analysis (they lie in the smooth continuous tail of the hours-skill relation of a simulated DGP; dropping them would truncate on treatment), report a sensitivity analysis excluding them.
  • 2026-10-30 P1 passed. P2 passed (naive slope -0.135).
  • 2026-10-30 P3 passed: main OLS with skill control, HC1; effect 0.252 pp/h.
  • 2026-10-30 P4 passed: clean re-run identical; checks.md; gate receipt 20261030T040757 (only P5 items missing).
  • 2026-10-30 P5 passed: report and claims written; gate receipt 20261030T040824 passed.
Files · 452964ee0fbbaa40fbbed2c87a54ca798ffd6a85
Menu

Theme