SPB Git

spb/wp29_uqo

Public
499 B · 7 lines markdown
1- 2026-10-30 P0 passed: contract written.2- 2026-10-30 P1 passed: audit + hashes verified; Table 6 SE preferred over A19 SE.3- 2026-10-30 P1 passed: audit + hashes verified; Table 6 SE preferred over A19 SE.4- 2026-10-30 P2/P3 passed: extraction script written; fixed se_reported false-positive (matched editor header).5- 2026-10-30 P4 passed (gate run 1 receipt 20261030T052544.808341Z); P5 report+claims written.6- 2026-10-30 P5 passed; final gate PASSED (20261030T052620.019566Z). Task complete.7
Files · 452964ee0fbbaa40fbbed2c87a54ca798ffd6a85
Menu

Theme