SPB Git

spb/wp29_uqo

Public
  • 2026-10-30 P0 passed: contract written.
  • 2026-10-30 P1 passed: audit done, no exclusions. P2 baseline = closed form (savings rate alpha*beta). P3: analysis.py written, VFI converged in 361 iterations.
  • 2026-10-30 P4 checks recorded; gate run 1 (pre-report) failed only on report/claims/ledger. P5 report and claims written.
  • 2026-10-30 P5 passed; final gate PASSED (receipt 20261030T043923.684860Z.json).
Files · 46a1f53512bec3cd5d9c16e8fc9d9da4129c09cc
Menu

Theme