SPB Git

spb/wp29_uqo

Public
  • 2026-10-30 P0: contract written.
  • 2026-10-30 P1: data audited, no issues.
  • 2026-10-30 P2: baseline = independent-sum simulation (prop. B), KS 0.002.
  • 2026-10-30 P3: decision: counterexample Y = S·X with Rademacher S (atom of mass 1/2 at 0 gives KS ≥ 0.25, clearly visible at n=1e5). Seeded rng draws X then S then baseline.
  • 2026-10-30 P4: reproducibility and consistency checks passed; gate run.
  • 2026-10-30 P5: report, claims written; final gate run.
Files · 46a1f53512bec3cd5d9c16e8fc9d9da4129c09cc
Menu

Theme