SPB Git

spb/wp29_uqo

Public
428 B · 5 lines markdown
1# Log2- 2026-10-30 P0 passed: contract written.3- 2026-10-30 P1: audit found 36 corrupted lines (file lines 701-736) and 25 quoted prices with thousands separator. Decision: quoted prices are unambiguous under RFC-4180 CSV quoting -> parse by removing comma; corrupted lines excluded, not reconstructed.4- 2026-10-30 P2-P5 passed: baseline=control totals; analysis run; re-run identical; checks pass; report and claims written.5
Files · 6df43c338e49477c769c36e7f7d249af2563db7f
Menu

Theme