SPB Git

spb/wp29_uqo

Public

# Log

  • 2026-10-30 P0: read TASK.md, README, gate_spec; contract written.
  • 2026-10-30 P1: SHA-256 of all 5 extracts match README/bundle; all files read in full.
  • 2026-10-30 P2-P5: baseline, analysis, verification (identical rerun), report and claims done; all phases passed. Result: unverifiable=[R3], n_verified=4.
Files · 76f9a44a3a85fb2bc2b0b370a4ae4eed9b95e579
Menu

Theme