SPB Git

spb/wp29_uqo

Public
2.7 KB

# Pilot report (development tasks, 1 repeat per arm)

Generated 2026-10-30T04:03:02+00:00 from results/analysis_data/*.csv by analysis/pilot_report.py.

Runs assigned 24, evaluated 24, tasks 6 (F1-dev-01, F2-dev-01, F3-dev-01, F4-dev-01, F5-dev-01, F6-dev-01). Model reported by the client: claude-opus-5-5; client 2.1.314 (Claude Code).

# Outcomes by arm

arm runs Y (task-weighted) success (any) runs with violation reproducible quality mean mean cost USD median cost max cost mean wall s max wall s sessions/run
A 6 0.83 0.83 0 1.00 0.990 0.221 0.204 0.353 70 114 1.0
B 6 1.00 1.00 0 1.00 1.000 0.369 0.334 0.489 111 154 1.0
C 6 1.00 1.00 0 1.00 1.000 0.406 0.412 0.506 117 151 1.0
D 6 1.00 1.00 0 1.00 1.000 0.579 0.565 0.840 162 229 2.0

# Outcomes by task

task Y A Y B Y C Y D cost A cost B cost C cost D
F1-dev-01 1 1 1 1 0.19 0.30 0.40 0.46
F2-dev-01 1 1 1 1 0.14 0.31 0.26 0.39
F3-dev-01 0 1 1 1 0.27 0.49 0.50 0.68
F4-dev-01 1 1 1 1 0.21 0.31 0.42 0.67
F5-dev-01 1 1 1 1 0.16 0.36 0.35 0.43
F6-dev-01 1 1 1 1 0.35 0.45 0.51 0.84

# Sessions

n cost_mean turns_mean duration_s
('executor', 'initial') 24 0.36 11.04 106.47
('reviewer', 'review') 6 0.14 5.83 32.07

# Gate receipts (controller-side)

origin passed n
controller 1 12
final_common_contract_check 1 24

# Reviews (arm D)

verdict n issues_mean
accept 6 2.83333
  • Projected 24 tasks × 4 arms × 3 repeats: 288 runs ≈ 130 USD (1.15 × mean pilot cost 0.394), ≈ 1.1 h at 8 concurrent runs (mean pilot wall 115 s).
  • Projected 24 × 4 × 2: 192 runs ≈ 87 USD (1.15 × mean pilot cost 0.394), ≈ 0.8 h at 8 concurrent runs (mean pilot wall 115 s).
  • Projected 12 × 4 × 2: 96 runs ≈ 43 USD (1.15 × mean pilot cost 0.394), ≈ 0.4 h at 8 concurrent runs (mean pilot wall 115 s).

Scale decision rule (preregistration §6): choose the largest configuration whose projected cost fits the remaining envelope after a 150 USD reserve and whose projected time is ≤ 12 h.

Files · main
Menu

Theme