- 2026-10-30 P0 passed: contract written.
- 2026-10-30 P1-P3 passed; discrete-choice VFI on prescribed grid, log-linear interpolation at eval points. P4 checks pass; running gate.
- 2026-10-30 P4 passed (gate receipt 20261030T043909). P5 report/claims written; running final gate.
- 2026-10-30 P5 passed; final gate PASSED (20261030T043942).