- 2026-10-30 P0 passed: contract written.
- 2026-10-30 P1 passed: design audited, no issues.
- 2026-10-30 P1 passed: design audited, no issues.
- 2026-10-30 P2-P4 passed (baseline, MC, verification; gate#1 failures only for missing P5 files). P5 report+claims written.
- 2026-10-30 P5 passed; final gate PASSED (20261030T051447.946386Z).