- 2026-10-30 P0 passed: contract written.
- 2026-10-30 P1 passed: audit + exclusions written; 6 anomalies logged.
- 2026-10-30 P2 passed: baseline = verbatim extraction (same as final for an extraction task).
- 2026-10-30 P3 passed: analysis.py written; decision: z=1.96 for both derivations; Table 6 SE used over Table A19.
- 2026-10-30 P4 passed: re-run identical; checks.md all PASS; gate run (P5 items pending).
- 2026-10-30 P5 passed: report, claims written; final gate PASSED (20261030T052639.522733Z).