-
Fri, Oct 30, 2026 2
-
Main benchmark running; appendix generators, gallery, reflexive draft, paper compiles (80 pp. skeleton)
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
Preregistration v1.0 (pilot-informed decisions), recovery drivers
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
-
Thu, Oct 29, 2026 1
-
Task suite (F1,F2,F4,F5,F6 + partial F3), evaluator validation, analysis pipeline, paper skeleton, pilot batch 1 launched
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-