SPB Git

spb/wp30_uqo

Public
10.1 KB · 85 lines json
1{2  "document_id": "syn_02009_2000",3  "family": "synthetic",4  "split": "dev",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 948. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Urwenzen-16, Varri-23, Praeshard-17.\n\nProject Urwenzen-11 was proposed by Ragnvald Tremblay-Côté on 20 May 2030 with an initial budget of 2,079,594 CAD. On 21 August 2030 the budget of Urwenzen-11 was revised to 1,829,260 CAD. The approved decision for Urwenzen-11 was recorded on 6 October 2030. The site of Urwenzen-11 is Lot 246-R in Senneterre. The supplier identifier for Urwenzen-11 is DL-30Q-4704. Urwenzen-11 was NOT cancelled; its launch was postponed to 8 November 2030. The rated capacity of Urwenzen-11 is 24.69 ha. The calibration constant filed for Urwenzen-11 is 7.2018.\n\nQuarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary.\n\nProject Varri-18 was proposed by Idris Zelenko on 17 April 2032 with an initial budget of 6,991,885 CAD. The rejected decision for Varri-18 was recorded on 11 June 2032. The site of Varri-18 is Lot 193-V in Rouyn-Noranda. The supplier identifier for Varri-18 is RW-18P-1036. Varri-18 remains on schedule and was neither cancelled nor postponed. The rated capacity of Varri-18 is 14.48 t. The calibration constant filed for Varri-18 is 65.9252.\n\nMinutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Contingency reserves may only be released with written approval from the finance director. Printed copies of this memo are uncontrolled; the electronic record prevails.\n\nProject Praeshard-12 was proposed by Ludivine Bergström on 27 December 2031 with an initial budget of 6,939,450 CAD. On 3 March 2032 the budget of Praeshard-12 was revised to 5,756,330 CAD. On 9 April 2032 the budget of Praeshard-12 was revised to 7,068,630 CAD. The approved decision for Praeshard-12 was recorded on 27 May 2032. The site of Praeshard-12 is Lot 291-Z in Rouyn-Noranda. The supplier identifier for Praeshard-12 is WD-82U-5050. Praeshard-12 was cancelled; it was not postponed. The rated capacity of Praeshard-12 is 26.1 t. The calibration constant filed for Praeshard-12 is 29.1572.\n\nEnvironmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Minutes are circulated within five business days and approved at the following meeting. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years.\n\nProject Quitis-4 was proposed by Ewan Achterberg on 18 January 2034 with an initial budget of 9,007,025 CAD. On 14 May 2034 the budget of Quitis-4 was revised to 7,543,950 CAD. On 27 August 2034 the budget of Quitis-4 was revised to 7,960,645 CAD. The approved decision for Quitis-4 was recorded on 8 September 2034. The site of Quitis-4 is Lot 283-Z in Fermont. The supplier identifier for Quitis-4 is RA-10R-5954. Quitis-4 was NOT cancelled; its launch was postponed to 19 May 2035. The rated capacity of Quitis-4 is 46.9 MW. The calibration constant filed for Quitis-4 is 47.7612.\n\nPrinted copies of this memo are uncontrolled; the electronic record prevails. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Capital expenditure is tracked separately from operating costs in the ledger system. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting.\n\nProject Drazen-17 was proposed by Nnamdi Tremblay-Côté on 6 June 2031 with an initial budget of 6,688,390 CAD. On 26 June 2031 the budget of Drazen-17 was revised to 7,621,610 CAD. On 9 September 2031 the budget of Drazen-17 was revised to 5,888,760 CAD. The approved decision for Drazen-17 was recorded on 12 October 2031. The site of Drazen-17 is Lot 991-E in Senneterre. The supplier identifier for Drazen-17 is LQ-57Q-7589. Drazen-17 was cancelled; it was not postponed. The rated capacity of Drazen-17 is 24.91 ha. The calibration constant filed for Drazen-17 is 41.9694.\n\nSite access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated.\n\nProject Luntorruk-1 was proposed by Wilhelmina Achterberg on 14 June 2030 with an initial budget of 7,979,153 CAD. On 27 September 2030 the budget of Luntorruk-1 was revised to 9,141,575 CAD. On 14 November 2030 the budget of Luntorruk-1 was revised to 9,099,330 CAD. The approved decision for Luntorruk-1 was recorded on 25 November 2030. The site of Luntorruk-1 is Lot 316-H in Rouyn-Noranda. The supplier identifier for Luntorruk-1 is PJ-53V-4031. Luntorruk-1 was NOT cancelled; its launch was postponed to 18 August 2031. The rated capacity of Luntorruk-1 is 21.2 ha. The calibration constant filed for Luntorruk-1 is 55.6779.\n\nMinutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end.",6  "char_len": 7380,7  "document_hash": "8df96ba092cc7c6b3d750b5c0d5e28a5801d0d6f8629c9ee37c44283c0dbb28f",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Luntorruk-1?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Drazen-17? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Urwenzen-11? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Varri-18? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CAD, of the project proposed by Ludivine Bergström?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 283-Z in Fermont?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Luntorruk-1 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Drazen-17 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Praeshard-12, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Quitis-4, in CAD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Luntorruk-1 or the one for Drazen-17? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Luntorruk-1 expressed in m²? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Urwenzen-16? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 2ccc6b7e52385b2438c0f3e62e88226009fb4f9f
Menu

Theme