SPB Git

spb/wp30_uqo

Public
10.0 KB · 85 lines json
1{2  "document_id": "syn_03030_2000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 758. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Lunmel-3, Talker-19, Rukrivar-12.\n\nProject Lunmel-1 was proposed by Bohdan Achterberg on 26 August 2031 with an initial budget of 5,891,120 CAD. On 8 October 2031 the budget of Lunmel-1 was revised to 5,432,565 CAD. On 25 November 2031 the budget of Lunmel-1 was revised to 6,019,690 CAD. The approved decision for Lunmel-1 was recorded on 7 December 2031. The site of Lunmel-1 is Lot 363-M in Chibougamau. The supplier identifier for Lunmel-1 is PX-35X-6550. Lunmel-1 remains on schedule and was neither cancelled nor postponed. The rated capacity of Lunmel-1 is 3.9 ha. The calibration constant filed for Lunmel-1 is 44.7641.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Quarterly reviews are held on the second Tuesday of the month following the quarter end.\n\nProject Talker-16 was proposed by Lorcan Bergström on 6 October 2032 with an initial budget of 905,592 CAD. The rejected decision for Talker-16 was recorded on 18 November 2032. The site of Talker-16 is Lot 444-T in Lebel-sur-Quévillon. The supplier identifier for Talker-16 is JP-78N-8035. Talker-16 remains on schedule and was neither cancelled nor postponed. The rated capacity of Talker-16 is 3.46 km. The calibration constant filed for Talker-16 is 38.6924.\n\nQuarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. Project codes follow the pattern of a name, a hyphen and a sequence number.\n\nProject Rukrivar-11 was proposed by Ewan Sørlie on 26 January 2034 with an initial budget of 728,930 USD. On 23 April 2034 the budget of Rukrivar-11 was revised to 745,170 USD. On 23 May 2034 the budget of Rukrivar-11 was revised to 693,765 USD. The approved decision for Rukrivar-11 was recorded on 1 July 2034. The site of Rukrivar-11 is Lot 722-A in Mont-Laurier. The supplier identifier for Rukrivar-11 is BF-57Y-4991. Rukrivar-11 was NOT cancelled; its launch was postponed to 18 February 2035. The rated capacity of Rukrivar-11 is 42.32 MW. The calibration constant filed for Rukrivar-11 is 7.5590.\n\nAll timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated.\n\nProject Selnakri-4 was proposed by Teodora Achterberg on 13 June 2033 with an initial budget of 2,991,556 CAD. On 29 August 2033 the budget of Selnakri-4 was revised to 2,657,180 CAD. On 21 November 2033 the budget of Selnakri-4 was revised to 2,892,805 CAD. The rejected decision for Selnakri-4 was recorded on 28 December 2033. The site of Selnakri-4 is Lot 552-M in Schefferville. The supplier identifier for Selnakri-4 is SA-99X-5582. Selnakri-4 remains on schedule and was neither cancelled nor postponed. The rated capacity of Selnakri-4 is 25.63 km. The calibration constant filed for Selnakri-4 is 23.3471.\n\nWhere two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion.\n\nProject Lithixost-6 was proposed by Haruki Rousseau on 17 July 2034 with an initial budget of 9,797,250 CAD. On 15 September 2034 the budget of Lithixost-6 was revised to 9,781,465 CAD. The approved decision for Lithixost-6 was recorded on 13 November 2034. The site of Lithixost-6 is Lot 503-T in Mont-Laurier. The supplier identifier for Lithixost-6 is SW-33M-9064. Lithixost-6 remains on schedule and was neither cancelled nor postponed. The rated capacity of Lithixost-6 is 46.64 t. The calibration constant filed for Lithixost-6 is 49.6551.\n\nAll timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years.\n\nProject Gamoby-7 was proposed by Lorcan Rousseau on 11 July 2034 with an initial budget of 9,488,678 CHF. On 23 October 2034 the budget of Gamoby-7 was revised to 11,037,575 CHF. The approved decision for Gamoby-7 was recorded on 19 December 2034. The site of Gamoby-7 is Lot 331-G in Rouyn-Noranda. The supplier identifier for Gamoby-7 is YH-36P-5569. Gamoby-7 was cancelled; it was not postponed. The rated capacity of Gamoby-7 is 35.8 t. The calibration constant filed for Gamoby-7 is 4.8545.\n\nSite access badges must be renewed annually and returned on project completion. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. The internal audit function reports to the governance board and not to project leads. Contingency reserves may only be released with written approval from the finance director.",6  "char_len": 7269,7  "document_hash": "9c6bfb3375c1aa9b40fde8fc1869057807819db862004b3e34d74015983cf573",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Selnakri-4?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Lithixost-6? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Gamoby-7? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Talker-16? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in USD, of the project proposed by Ewan Sørlie?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 363-M in Chibougamau?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Rukrivar-11 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Gamoby-7 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Rukrivar-11, in USD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Selnakri-4, in CAD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Selnakri-4 or the one for Lithixost-6? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Selnakri-4 expressed in m? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Lunmel-3? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 2ccc6b7e52385b2438c0f3e62e88226009fb4f9f
Menu

Theme