SPB Git

spb/wp30_uqo

Public
31.7 KB · 85 lines json
1{2  "document_id": "syn_01010_8000",3  "family": "synthetic",4  "split": "train",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 833. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Eshmel-19, Kofel-15, Novnov-17.\n\nProject Eshmel-14 was proposed by Teodora Tremblay-Côté on 6 July 2032 with an initial budget of 2,571,145 CAD. On 26 July 2032 the budget of Eshmel-14 was revised to 2,880,260 CAD. The approved decision for Eshmel-14 was recorded on 30 August 2032. The site of Eshmel-14 is Lot 540-W in Senneterre. The supplier identifier for Eshmel-14 is KZ-28E-9279. Eshmel-14 remains on schedule and was neither cancelled nor postponed. The rated capacity of Eshmel-14 is 19.06 km. The calibration constant filed for Eshmel-14 is 98.5153.\n\nWhere two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Site access badges must be renewed annually and returned on project completion. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Environmental monitoring reports are archived by the records office for a period of seven years. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold.\n\nProject Kofel-14 was proposed by Dagny Zelenko on 25 December 2029 with an initial budget of 461,575 EUR. The approved decision for Kofel-14 was recorded on 1 January 2030. The site of Kofel-14 is Lot 592-L in Lebel-sur-Quévillon. The supplier identifier for Kofel-14 is SG-53E-6259. Kofel-14 was NOT cancelled; its launch was postponed to 26 February 2030. The rated capacity of Kofel-14 is 41.8 t. The calibration constant filed for Kofel-14 is 94.4305.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold.\n\nProject Novnov-13 was proposed by Casimir Abubakar on 6 June 2029 with an initial budget of 1,442,450 CAD. On 2 October 2029 the budget of Novnov-13 was revised to 1,326,655 CAD. On 22 October 2029 the budget of Novnov-13 was revised to 1,206,805 CAD. The approved decision for Novnov-13 was recorded on 3 December 2029. The site of Novnov-13 is Lot 916-N in Chibougamau. The supplier identifier for Novnov-13 is KZ-23S-1000. Novnov-13 remains on schedule and was neither cancelled nor postponed. The rated capacity of Novnov-13 is 43.0 km. The calibration constant filed for Novnov-13 is 18.9973.\n\nPrinted copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Capital expenditure is tracked separately from operating costs in the ledger system. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Environmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Rukesh-19 was proposed by Bohdan Baptiste-Roy on 23 January 2034 with an initial budget of 7,745,093 EUR. The rejected decision for Rukesh-19 was recorded on 10 February 2034. The site of Rukesh-19 is Lot 514-G in Chibougamau. The supplier identifier for Rukesh-19 is EQ-16W-8980. Rukesh-19 was cancelled; it was not postponed. The rated capacity of Rukesh-19 is 38.14 ha. The calibration constant filed for Rukesh-19 is 62.6672.\n\nMinutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. Quarterly reviews are held on the second Tuesday of the month following the quarter end.\n\nProject Urkogam-16 was proposed by Yevgenia Varga on 27 March 2033 with an initial budget of 2,556,362 CAD. On 14 April 2033 the budget of Urkogam-16 was revised to 2,971,635 CAD. The rejected decision for Urkogam-16 was recorded on 2 May 2033. The site of Urkogam-16 is Lot 920-P in Senneterre. The supplier identifier for Urkogam-16 is ZR-70A-6578. Urkogam-16 was NOT cancelled; its launch was postponed to 12 November 2033. The rated capacity of Urkogam-16 is 26.9 t. The calibration constant filed for Urkogam-16 is 84.8843.\n\nMinutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Project codes follow the pattern of a name, a hyphen and a sequence number. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Minutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Health and safety briefings are mandatory for all visitors before entering an active site. Minutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office.\n\nProject Novdraesh-9 was proposed by Casimir Ouellet-Marchand on 2 June 2029 with an initial budget of 6,260,525 CAD. The rejected decision for Novdraesh-9 was recorded on 10 June 2029. The site of Novdraesh-9 is Lot 687-F in Baie-Comeau. The supplier identifier for Novdraesh-9 is JC-72H-3066. Novdraesh-9 remains on schedule and was neither cancelled nor postponed. The rated capacity of Novdraesh-9 is 14.8 km. The calibration constant filed for Novdraesh-9 is 45.0345.\n\nThe internal audit function reports to the governance board and not to project leads. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years.",6  "char_len": 29452,7  "document_hash": "2686921eb4a27b72dbfa9258a6f63a1d4ffd33b74239d977deeb8b50cf042081",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Urkogam-16?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Rukesh-19? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Novnov-13? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Eshmel-14? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in EUR, of the project proposed by Dagny Zelenko?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 687-F in Baie-Comeau?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Urkogam-16 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Rukesh-19 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Novnov-13, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Novnov-13, in CAD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Urkogam-16 or the one for Rukesh-19? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Urkogam-16 expressed in kg? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Eshmel-19? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme