SPB Git

spb/wp30_uqo

Public
10.3 KB · 85 lines json
1{2  "document_id": "syn_01021_2000",3  "family": "synthetic",4  "split": "train",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 210. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Gamvol-19, Kokosel-18, Ymiwen-12.\n\nProject Gamvol-18 was proposed by Ragnvald Lindqvist on 14 October 2032 with an initial budget of 7,041,890 CAD. The approved decision for Gamvol-18 was recorded on 7 December 2032. The site of Gamvol-18 is Lot 365-T in Matagami. The supplier identifier for Gamvol-18 is HM-57N-8460. Gamvol-18 was cancelled; it was not postponed. The rated capacity of Gamvol-18 is 15.7 MW. The calibration constant filed for Gamvol-18 is 87.1251.\n\nProcurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number.\n\nProject Kokosel-15 was proposed by Marisol Mbeki on 4 October 2033 with an initial budget of 992,475 CAD. On 26 January 2034 the budget of Kokosel-15 was revised to 1,110,150 CAD. On 19 May 2034 the budget of Kokosel-15 was revised to 890,775 CAD. The rejected decision for Kokosel-15 was recorded on 1 June 2034. The site of Kokosel-15 is Lot 972-M in La Tuque. The supplier identifier for Kokosel-15 is CC-18L-7549. Kokosel-15 was NOT cancelled; its launch was postponed to 10 July 2034. The rated capacity of Kokosel-15 is 21.0 ha. The calibration constant filed for Kokosel-15 is 87.6616.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold.\n\nProject Ymiwen-9 was proposed by Tarek Dubrovnik on 27 April 2029 with an initial budget of 2,201,100 CAD. On 20 July 2029 the budget of Ymiwen-9 was revised to 2,220,035 CAD. On 14 September 2029 the budget of Ymiwen-9 was revised to 2,472,200 CAD. The approved decision for Ymiwen-9 was recorded on 21 October 2029. The site of Ymiwen-9 is Lot 117-B in Témiscaming. The supplier identifier for Ymiwen-9 is DQ-78U-2657. Ymiwen-9 remains on schedule and was neither cancelled nor postponed. The rated capacity of Ymiwen-9 is 23.72 MW. The calibration constant filed for Ymiwen-9 is 67.5161.\n\nThe internal audit function reports to the governance board and not to project leads. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated.\n\nProject Melgammun-19 was proposed by Kwame Bergström on 13 September 2034 with an initial budget of 748,725 CAD. The approved decision for Melgammun-19 was recorded on 19 October 2034. The site of Melgammun-19 is Lot 875-B in Sept-Îles. The supplier identifier for Melgammun-19 is BY-38W-4755. Melgammun-19 was cancelled; it was not postponed. The rated capacity of Melgammun-19 is 1.11 t. The calibration constant filed for Melgammun-19 is 12.8815.\n\nContingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails.\n\nProject Rukwen-14 was proposed by Kwame Lindqvist on 2 August 2031 with an initial budget of 7,060,450 CHF. On 11 October 2031 the budget of Rukwen-14 was revised to 8,077,265 CHF. On 7 December 2031 the budget of Rukwen-14 was revised to 8,140,125 CHF. The approved decision for Rukwen-14 was recorded on 25 January 2032. The site of Rukwen-14 is Lot 297-L in Schefferville. The supplier identifier for Rukwen-14 is HT-25V-8451. Rukwen-14 was cancelled; it was not postponed. The rated capacity of Rukwen-14 is 38.1 ha. The calibration constant filed for Rukwen-14 is 97.7004.\n\nSite access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Ruktis-13 was proposed by Lorcan Bergström on 8 January 2034 with an initial budget of 6,971,218 CAD. The rejected decision for Ruktis-13 was recorded on 19 February 2034. The site of Ruktis-13 is Lot 52-E in Fermont. The supplier identifier for Ruktis-13 is EB-40W-2997. Ruktis-13 was NOT cancelled; its launch was postponed to 7 January 2035. The rated capacity of Ruktis-13 is 32.3 ha. The calibration constant filed for Ruktis-13 is 34.7544.\n\nProcurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site.",6  "char_len": 7614,7  "document_hash": "808bb8493cf855135217c04e2b13e775b5fec6afecce8b5d5a655c8ff401f7c8",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Ruktis-13?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Ymiwen-9? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Gamvol-18? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Melgammun-19? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CHF, of the project proposed by Kwame Lindqvist?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 972-M in La Tuque?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Ruktis-13 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Gamvol-18 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Kokosel-15, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Rukwen-14, in CHF? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Ruktis-13 or the one for Ymiwen-9? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Ruktis-13 expressed in m²? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Gamvol-19? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme