SPB Git

spb/wp30_uqo

Public
31.4 KB · 85 lines json
1{2  "document_id": "syn_01031_8000",3  "family": "synthetic",4  "split": "train",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 152. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Lithker-12, Feltalnov-15, Munlunmun-17.\n\nProject Lithker-11 was proposed by Lorcan Obuya on 21 June 2029 with an initial budget of 4,812,150 NOK. On 7 August 2029 the budget of Lithker-11 was revised to 5,635,090 NOK. On 21 August 2029 the budget of Lithker-11 was revised to 4,783,205 NOK. The approved decision for Lithker-11 was recorded on 4 September 2029. The site of Lithker-11 is Lot 492-F in Baie-Comeau. The supplier identifier for Lithker-11 is DW-82R-7741. Lithker-11 remains on schedule and was neither cancelled nor postponed. The rated capacity of Lithker-11 is 27.9 MW. The calibration constant filed for Lithker-11 is 17.2495.\n\nProcurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. Minutes are circulated within five business days and approved at the following meeting. Site access badges must be renewed annually and returned on project completion. Health and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Feltalnov-12 was proposed by Zéphyrine Lindqvist on 4 August 2029 with an initial budget of 4,370,500 NOK. On 26 November 2029 the budget of Feltalnov-12 was revised to 4,454,080 NOK. On 13 January 2030 the budget of Feltalnov-12 was revised to 4,626,460 NOK. The approved decision for Feltalnov-12 was recorded on 3 February 2030. The site of Feltalnov-12 is Lot 679-E in Mont-Laurier. The supplier identifier for Feltalnov-12 is UY-30H-3499. Feltalnov-12 was cancelled; it was not postponed. The rated capacity of Feltalnov-12 is 35.19 ha. The calibration constant filed for Feltalnov-12 is 37.4788.\n\nProcurement follows the standard three-quote rule for purchases above the departmental threshold. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. Minutes are circulated within five business days and approved at the following meeting. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Minutes are circulated within five business days and approved at the following meeting. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting. Contingency reserves may only be released with written approval from the finance director. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number.\n\nProject Munlunmun-13 was proposed by Lorcan Sørlie on 22 April 2030 with an initial budget of 3,920,959 CAD. On 26 May 2030 the budget of Munlunmun-13 was revised to 4,477,965 CAD. On 5 September 2030 the budget of Munlunmun-13 was revised to 3,819,645 CAD. The approved decision for Munlunmun-13 was recorded on 14 September 2030. The site of Munlunmun-13 is Lot 93-L in Senneterre. The supplier identifier for Munlunmun-13 is CS-96C-2282. Munlunmun-13 remains on schedule and was neither cancelled nor postponed. The rated capacity of Munlunmun-13 is 15.11 km. The calibration constant filed for Munlunmun-13 is 12.3663.\n\nAll timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Contingency reserves may only be released with written approval from the finance director. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion.\n\nProject Ardlithtal-14 was proposed by Oksana Haldorsen on 27 October 2030 with an initial budget of 2,450,650 CAD. On 23 December 2030 the budget of Ardlithtal-14 was revised to 2,334,675 CAD. On 10 April 2031 the budget of Ardlithtal-14 was revised to 2,632,125 CAD. The rejected decision for Ardlithtal-14 was recorded on 7 May 2031. The site of Ardlithtal-14 is Lot 408-S in Senneterre. The supplier identifier for Ardlithtal-14 is RQ-27B-5358. Ardlithtal-14 was NOT cancelled; its launch was postponed to 10 July 2031. The rated capacity of Ardlithtal-14 is 17.68 t. The calibration constant filed for Ardlithtal-14 is 52.5993.\n\nTravel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Project codes follow the pattern of a name, a hyphen and a sequence number.\n\nProject Lithwen-6 was proposed by Kwame Kirchhoff on 28 April 2030 with an initial budget of 638,565 USD. On 7 June 2030 the budget of Lithwen-6 was revised to 563,935 USD. The approved decision for Lithwen-6 was recorded on 25 July 2030. The site of Lithwen-6 is Lot 315-N in Fermont. The supplier identifier for Lithwen-6 is WN-91L-2227. Lithwen-6 remains on schedule and was neither cancelled nor postponed. The rated capacity of Lithwen-6 is 13.33 t. The calibration constant filed for Lithwen-6 is 24.8918.\n\nWhere two entries conflict, the entry with the later timestamp supersedes the earlier one. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Contingency reserves may only be released with written approval from the finance director. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads.\n\nProject Torfel-16 was proposed by Oksana Obuya on 15 January 2031 with an initial budget of 6,542,030 CAD. On 5 May 2031 the budget of Torfel-16 was revised to 5,667,915 CAD. The approved decision for Torfel-16 was recorded on 2 July 2031. The site of Torfel-16 is Lot 173-C in Fermont. The supplier identifier for Torfel-16 is JC-52T-4391. Torfel-16 was NOT cancelled; its launch was postponed to 1 November 2031. The rated capacity of Torfel-16 is 17.28 ha. The calibration constant filed for Torfel-16 is 66.2629.\n\nCapital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years.",6  "char_len": 29131,7  "document_hash": "e09f1c5df4cda53af832ae17b2d8491d3e639a5ee1558cb171272f3575a58e21",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Feltalnov-12?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Ardlithtal-14? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Munlunmun-13? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Torfel-16? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in USD, of the project proposed by Kwame Kirchhoff?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 492-F in Baie-Comeau?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Ardlithtal-14 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Feltalnov-12 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Ardlithtal-14, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Lithker-11, in NOK? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Feltalnov-12 or the one for Ardlithtal-14? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Feltalnov-12 expressed in m²? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Lithker-12? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme