SPB Git

spb/wp30_uqo

Public
9.9 KB · 85 lines json
1{2  "document_id": "syn_03000_2000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 569. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Lunmel-13, Britormel-24, Wendra-11.\n\nProject Lunmel-9 was proposed by Dagny Ouellet-Marchand on 10 November 2034 with an initial budget of 2,542,075 EUR. On 25 December 2034 the budget of Lunmel-9 was revised to 2,286,335 EUR. On 11 March 2035 the budget of Lunmel-9 was revised to 2,705,965 EUR. The approved decision for Lunmel-9 was recorded on 28 April 2035. The site of Lunmel-9 is Lot 409-H in Senneterre. The supplier identifier for Lunmel-9 is LY-51E-3199. Lunmel-9 was NOT cancelled; its launch was postponed to 4 November 2035. The rated capacity of Lunmel-9 is 20.46 ha. The calibration constant filed for Lunmel-9 is 86.1676.\n\nHealth and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site.\n\nProject Britormel-19 was proposed by Kwame Haldorsen on 21 February 2033 with an initial budget of 9,220,745 CAD. On 11 June 2033 the budget of Britormel-19 was revised to 9,127,965 CAD. On 8 September 2033 the budget of Britormel-19 was revised to 10,440,170 CAD. The rejected decision for Britormel-19 was recorded on 24 September 2033. The site of Britormel-19 is Lot 591-W in Senneterre. The supplier identifier for Britormel-19 is HE-50G-4487. Britormel-19 was NOT cancelled; its launch was postponed to 30 July 2034. The rated capacity of Britormel-19 is 4.4 MW. The calibration constant filed for Britormel-19 is 78.9440.\n\nCapital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director.\n\nProject Wendra-7 was proposed by Yevgenia Kirchhoff on 7 September 2033 with an initial budget of 2,358,405 CAD. The approved decision for Wendra-7 was recorded on 18 September 2033. The site of Wendra-7 is Lot 19-N in Gaspé. The supplier identifier for Wendra-7 is LX-29D-9896. Wendra-7 was NOT cancelled; its launch was postponed to 1 January 2034. The rated capacity of Wendra-7 is 40.4 MW. The calibration constant filed for Wendra-7 is 54.8609.\n\nMinutes are circulated within five business days and approved at the following meeting. Environmental monitoring reports are archived by the records office for a period of seven years. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Aldwenbri-19 was proposed by Lorcan Okonkwo on 22 February 2032 with an initial budget of 1,243,700 CAD. On 27 May 2032 the budget of Aldwenbri-19 was revised to 1,034,805 CAD. On 4 September 2032 the budget of Aldwenbri-19 was revised to 1,402,360 CAD. The approved decision for Aldwenbri-19 was recorded on 4 October 2032. The site of Aldwenbri-19 is Lot 492-P in Sept-Îles. The supplier identifier for Aldwenbri-19 is WB-80E-5113. Aldwenbri-19 remains on schedule and was neither cancelled nor postponed. The rated capacity of Aldwenbri-19 is 45.1 MW. The calibration constant filed for Aldwenbri-19 is 37.4349.\n\nSite access badges must be renewed annually and returned on project completion. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Quarterly reviews are held on the second Tuesday of the month following the quarter end.\n\nProject Felaldnak-7 was proposed by Lorcan Mäkelä on 21 June 2034 with an initial budget of 3,569,215 CAD. The rejected decision for Felaldnak-7 was recorded on 15 July 2034. The site of Felaldnak-7 is Lot 225-N in Val-d'Or. The supplier identifier for Felaldnak-7 is ZL-78K-5065. Felaldnak-7 was NOT cancelled; its launch was postponed to 28 July 2035. The rated capacity of Felaldnak-7 is 44.8 km. The calibration constant filed for Felaldnak-7 is 92.5508.\n\nTravel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one.\n\nProject Ostban-9 was proposed by Casimir Mbeki on 22 August 2031 with an initial budget of 5,789,678 CAD. The approved decision for Ostban-9 was recorded on 18 October 2031. The site of Ostban-9 is Lot 743-K in Amos. The supplier identifier for Ostban-9 is EU-14W-9902. Ostban-9 was NOT cancelled; its launch was postponed to 15 August 2032. The rated capacity of Ostban-9 is 17.38 t. The calibration constant filed for Ostban-9 is 53.8485.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years.",6  "char_len": 7122,7  "document_hash": "c9cc27c20b05b1f6e592846e84990ee9b69c42f9720a8e338ec2f6fca777fdbc",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Felaldnak-7?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Wendra-7? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Ostban-9? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Aldwenbri-19? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CAD, of the project proposed by Kwame Haldorsen?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 409-H in Senneterre?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Lunmel-9 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Wendra-7 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Lunmel-9, in EUR? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Aldwenbri-19, in CAD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Felaldnak-7 or the one for Wendra-7? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Felaldnak-7 expressed in m? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Lunmel-13? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme