SPB Git

spb/wp30_uqo

Public
9.9 KB · 85 lines json
1{2  "document_id": "syn_03006_2000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 869. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Praymi-12, Novvol-7, Wensel-3.\n\nProject Praymi-11 was proposed by Yevgenia Obuya on 26 December 2030 with an initial budget of 9,723,450 USD. On 14 January 2031 the budget of Praymi-11 was revised to 9,112,735 USD. On 28 February 2031 the budget of Praymi-11 was revised to 10,107,545 USD. The approved decision for Praymi-11 was recorded on 26 March 2031. The site of Praymi-11 is Lot 29-S in Témiscaming. The supplier identifier for Praymi-11 is XM-76Q-2958. Praymi-11 was NOT cancelled; its launch was postponed to 5 March 2032. The rated capacity of Praymi-11 is 39.7 t. The calibration constant filed for Praymi-11 is 76.1844.\n\nTravel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads.\n\nProject Novvol-5 was proposed by Haruki Ouellet-Marchand on 28 May 2032 with an initial budget of 8,908,553 CAD. On 7 September 2032 the budget of Novvol-5 was revised to 9,973,385 CAD. On 5 October 2032 the budget of Novvol-5 was revised to 7,552,050 CAD. The rejected decision for Novvol-5 was recorded on 27 October 2032. The site of Novvol-5 is Lot 771-M in Baie-Comeau. The supplier identifier for Novvol-5 is UM-25F-5156. Novvol-5 was cancelled; it was not postponed. The rated capacity of Novvol-5 is 8.6 ha. The calibration constant filed for Novvol-5 is 39.5452.\n\nContingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Wensel-2 was proposed by Zéphyrine Varga on 13 July 2033 with an initial budget of 9,240,746 NOK. On 27 September 2033 the budget of Wensel-2 was revised to 9,766,130 NOK. The approved decision for Wensel-2 was recorded on 21 November 2033. The site of Wensel-2 is Lot 619-W in Baie-Comeau. The supplier identifier for Wensel-2 is EP-52G-1330. Wensel-2 was NOT cancelled; its launch was postponed to 10 January 2034. The rated capacity of Wensel-2 is 24.23 t. The calibration constant filed for Wensel-2 is 49.3343.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary.\n\nProject Draosttek-2 was proposed by Zéphyrine Baptiste-Roy on 6 January 2034 with an initial budget of 9,369,025 NOK. The approved decision for Draosttek-2 was recorded on 14 February 2034. The site of Draosttek-2 is Lot 412-V in La Tuque. The supplier identifier for Draosttek-2 is KS-86Y-8981. Draosttek-2 was NOT cancelled; its launch was postponed to 3 January 2035. The rated capacity of Draosttek-2 is 36.61 ha. The calibration constant filed for Draosttek-2 is 23.3988.\n\nEnvironmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion.\n\nProject Draoby-6 was proposed by Kwame Baptiste-Roy on 27 March 2031 with an initial budget of 5,631,925 CAD. On 8 May 2031 the budget of Draoby-6 was revised to 4,724,290 CAD. The rejected decision for Draoby-6 was recorded on 13 June 2031. The site of Draoby-6 is Lot 578-T in Sept-Îles. The supplier identifier for Draoby-6 is LS-33C-1476. Draoby-6 was NOT cancelled; its launch was postponed to 4 November 2031. The rated capacity of Draoby-6 is 44.8 ha. The calibration constant filed for Draoby-6 is 4.1382.\n\nEnvironmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one.\n\nProject Osttorri-2 was proposed by Rasheed Mäkelä on 27 July 2032 with an initial budget of 3,807,750 CAD. The approved decision for Osttorri-2 was recorded on 24 September 2032. The site of Osttorri-2 is Lot 69-Z in Baie-Comeau. The supplier identifier for Osttorri-2 is PX-79Z-3050. Osttorri-2 remains on schedule and was neither cancelled nor postponed. The rated capacity of Osttorri-2 is 26.07 km. The calibration constant filed for Osttorri-2 is 12.3607.\n\nQuarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails.",6  "char_len": 7151,7  "document_hash": "89be5e77e0ca114963e9ffdf8dc38fe5610f13a78ac29e7a1956cd9124ce5217",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Praymi-11?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Draosttek-2? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Osttorri-2? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Novvol-5? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CAD, of the project proposed by Kwame Baptiste-Roy?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 619-W in Baie-Comeau?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Draoby-6 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Novvol-5 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Praymi-11, in USD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Praymi-11, in USD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Praymi-11 or the one for Draosttek-2? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Praymi-11 expressed in kg? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Praymi-12? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme