SPB Git

spb/wp30_uqo

Public
31.6 KB · 85 lines json
1{2  "document_id": "syn_03013_8000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 580. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Lithzenban-7, Ardpra-21, Seltek-18.\n\nProject Lithzenban-5 was proposed by Lorcan Baptiste-Roy on 5 March 2034 with an initial budget of 9,261,538 CAD. On 12 June 2034 the budget of Lithzenban-5 was revised to 9,056,740 CAD. On 29 June 2034 the budget of Lithzenban-5 was revised to 10,521,145 CAD. The approved decision for Lithzenban-5 was recorded on 28 August 2034. The site of Lithzenban-5 is Lot 169-R in Rouyn-Noranda. The supplier identifier for Lithzenban-5 is XK-22Q-9490. Lithzenban-5 was NOT cancelled; its launch was postponed to 19 April 2035. The rated capacity of Lithzenban-5 is 0.47 MW. The calibration constant filed for Lithzenban-5 is 8.1261.\n\nQuarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years.\n\nProject Ardpra-19 was proposed by Oksana Varga on 7 June 2029 with an initial budget of 8,955,800 CAD. On 26 July 2029 the budget of Ardpra-19 was revised to 7,782,250 CAD. The rejected decision for Ardpra-19 was recorded on 3 August 2029. The site of Ardpra-19 is Lot 234-K in Rouyn-Noranda. The supplier identifier for Ardpra-19 is FL-58A-9805. Ardpra-19 was cancelled; it was not postponed. The rated capacity of Ardpra-19 is 36.66 MW. The calibration constant filed for Ardpra-19 is 5.7295.\n\nHealth and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. Project codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Seltek-14 was proposed by Ragnvald Ishikawa on 3 June 2029 with an initial budget of 9,367,147 CAD. On 12 June 2029 the budget of Seltek-14 was revised to 9,600,255 CAD. On 29 July 2029 the budget of Seltek-14 was revised to 9,657,480 CAD. The rejected decision for Seltek-14 was recorded on 9 August 2029. The site of Seltek-14 is Lot 111-T in Témiscaming. The supplier identifier for Seltek-14 is YA-85D-7885. Seltek-14 remains on schedule and was neither cancelled nor postponed. The rated capacity of Seltek-14 is 14.4 ha. The calibration constant filed for Seltek-14 is 49.6176.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Minutes are circulated within five business days and approved at the following meeting. Contingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Project codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years.\n\nProject Briko-8 was proposed by Wilhelmina Qvistrand on 10 January 2031 with an initial budget of 9,519,700 CAD. On 21 March 2031 the budget of Briko-8 was revised to 10,511,705 CAD. The approved decision for Briko-8 was recorded on 30 March 2031. The site of Briko-8 is Lot 714-B in Mont-Laurier. The supplier identifier for Briko-8 is QF-39P-9809. Briko-8 was cancelled; it was not postponed. The rated capacity of Briko-8 is 31.5 km. The calibration constant filed for Briko-8 is 38.3828.\n\nAll timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one.\n\nProject Ruksol-3 was proposed by Dagny Mbeki on 2 March 2030 with an initial budget of 5,419,770 CAD. On 18 June 2030 the budget of Ruksol-3 was revised to 5,918,685 CAD. The approved decision for Ruksol-3 was recorded on 11 August 2030. The site of Ruksol-3 is Lot 229-K in Témiscaming. The supplier identifier for Ruksol-3 is HB-46G-1062. Ruksol-3 was NOT cancelled; its launch was postponed to 7 October 2030. The rated capacity of Ruksol-3 is 18.0 ha. The calibration constant filed for Ruksol-3 is 26.0995.\n\nThe internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Environmental monitoring reports are archived by the records office for a period of seven years. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. The committee reiterates that all figures are reported in nominal terms unless otherwise stated.\n\nProject Melbanur-1 was proposed by Casimir Bergström on 13 July 2030 with an initial budget of 9,632,220 EUR. On 9 November 2030 the budget of Melbanur-1 was revised to 10,897,865 EUR. On 2 March 2031 the budget of Melbanur-1 was revised to 8,846,545 EUR. The approved decision for Melbanur-1 was recorded on 6 April 2031. The site of Melbanur-1 is Lot 624-E in Val-d'Or. The supplier identifier for Melbanur-1 is MW-59U-8496. Melbanur-1 remains on schedule and was neither cancelled nor postponed. The rated capacity of Melbanur-1 is 38.28 km. The calibration constant filed for Melbanur-1 is 65.3868.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. Contingency reserves may only be released with written approval from the finance director. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Travel reimbursements require original receipts and a signed itinerary. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. The internal audit function reports to the governance board and not to project leads.",6  "char_len": 29333,7  "document_hash": "779b3b1693ab26a564a0bbea9239f13134bc3d34d4fb5688b86da554a5994b05",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Lithzenban-5?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Ruksol-3? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Melbanur-1? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Ardpra-19? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CAD, of the project proposed by Wilhelmina Qvistrand?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 111-T in Témiscaming?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Ruksol-3 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Briko-8 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Ardpra-19, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Melbanur-1, in EUR? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Lithzenban-5 or the one for Ruksol-3? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Lithzenban-5 expressed in kW? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Lithzenban-7? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme