SPB Git

spb/wp30_uqo

Public
31.3 KB · 85 lines json
1{2  "document_id": "syn_03028_8000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 892. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Felard-14, Torpra-12, Melqui-8.\n\nProject Felard-13 was proposed by Tarek Baptiste-Roy on 11 October 2031 with an initial budget of 5,229,625 CHF. On 31 January 2032 the budget of Felard-13 was revised to 5,063,490 CHF. On 29 February 2032 the budget of Felard-13 was revised to 4,314,475 CHF. The approved decision for Felard-13 was recorded on 6 April 2032. The site of Felard-13 is Lot 205-L in Fermont. The supplier identifier for Felard-13 is LN-61Q-3728. Felard-13 was NOT cancelled; its launch was postponed to 9 April 2033. The rated capacity of Felard-13 is 11.66 MW. The calibration constant filed for Felard-13 is 57.9177.\n\nHealth and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years.\n\nProject Torpra-9 was proposed by Milos Ouellet-Marchand on 2 May 2030 with an initial budget of 8,148,380 CAD. On 30 May 2030 the budget of Torpra-9 was revised to 8,626,110 CAD. On 19 July 2030 the budget of Torpra-9 was revised to 7,501,420 CAD. The approved decision for Torpra-9 was recorded on 2 September 2030. The site of Torpra-9 is Lot 912-P in Fermont. The supplier identifier for Torpra-9 is RP-84K-7646. Torpra-9 was cancelled; it was not postponed. The rated capacity of Torpra-9 is 34.81 km. The calibration constant filed for Torpra-9 is 59.8187.\n\nHealth and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated.\n\nProject Melqui-6 was proposed by Kwame Varga on 18 July 2034 with an initial budget of 9,158,140 CAD. On 18 August 2034 the budget of Melqui-6 was revised to 10,449,570 CAD. On 16 November 2034 the budget of Melqui-6 was revised to 10,066,730 CAD. The approved decision for Melqui-6 was recorded on 23 December 2034. The site of Melqui-6 is Lot 502-G in Val-d'Or. The supplier identifier for Melqui-6 is WY-69X-4402. Melqui-6 was NOT cancelled; its launch was postponed to 20 January 2036. The rated capacity of Melqui-6 is 3.2 km. The calibration constant filed for Melqui-6 is 93.7093.\n\nContingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary. Contingency reserves may only be released with written approval from the finance director. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director.\n\nProject Tisnakoby-1 was proposed by Kwame Sørlie on 17 January 2033 with an initial budget of 549,950 EUR. On 31 January 2033 the budget of Tisnakoby-1 was revised to 497,425 EUR. On 22 May 2033 the budget of Tisnakoby-1 was revised to 603,595 EUR. The rejected decision for Tisnakoby-1 was recorded on 1 June 2033. The site of Tisnakoby-1 is Lot 954-T in Mont-Laurier. The supplier identifier for Tisnakoby-1 is XR-11Q-9387. Tisnakoby-1 was cancelled; it was not postponed. The rated capacity of Tisnakoby-1 is 30.6 t. The calibration constant filed for Tisnakoby-1 is 49.3678.\n\nThe internal audit function reports to the governance board and not to project leads. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Contingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Minutes are circulated within five business days and approved at the following meeting. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Travel reimbursements require original receipts and a signed itinerary. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary.\n\nProject Pratalsol-5 was proposed by Zéphyrine Kirchhoff on 7 June 2030 with an initial budget of 4,971,485 CAD. On 20 June 2030 the budget of Pratalsol-5 was revised to 4,715,095 CAD. The approved decision for Pratalsol-5 was recorded on 10 August 2030. The site of Pratalsol-5 is Lot 409-M in Schefferville. The supplier identifier for Pratalsol-5 is PB-38S-9552. Pratalsol-5 was NOT cancelled; its launch was postponed to 22 September 2030. The rated capacity of Pratalsol-5 is 33.7 MW. The calibration constant filed for Pratalsol-5 is 68.0057.\n\nWhere two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Environmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number.\n\nProject Wentaloby-10 was proposed by Haruki Petrakis on 18 May 2032 with an initial budget of 2,942,377 NOK. The approved decision for Wentaloby-10 was recorded on 16 July 2032. The site of Wentaloby-10 is Lot 693-X in Mont-Laurier. The supplier identifier for Wentaloby-10 is MJ-84S-2582. Wentaloby-10 remains on schedule and was neither cancelled nor postponed. The rated capacity of Wentaloby-10 is 34.9 km. The calibration constant filed for Wentaloby-10 is 3.6021.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Minutes are circulated within five business days and approved at the following meeting. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold.",6  "char_len": 29095,7  "document_hash": "50541e370b2e371a17d9b2b638b294d78ed4610a8f11e47378d787390ed118aa",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Felard-13?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Melqui-6? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Torpra-9? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Wentaloby-10? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in EUR, of the project proposed by Kwame Sørlie?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 409-M in Schefferville?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Pratalsol-5 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Tisnakoby-1 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Tisnakoby-1, in EUR? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Tisnakoby-1, in EUR? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Felard-13 or the one for Melqui-6? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Felard-13 expressed in kW? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Felard-14? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme