SPB Git

spb/wp30_uqo

Public
10.3 KB · 85 lines json
1{2  "document_id": "syn_03039_2000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 450. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Riruk-14, Drabri-22, Ardtek-17.\n\nProject Riruk-11 was proposed by Teodora Baptiste-Roy on 11 September 2030 with an initial budget of 7,771,339 CAD. On 22 November 2030 the budget of Riruk-11 was revised to 7,961,250 CAD. The rejected decision for Riruk-11 was recorded on 14 January 2031. The site of Riruk-11 is Lot 282-X in Baie-Comeau. The supplier identifier for Riruk-11 is DA-68R-2815. Riruk-11 was NOT cancelled; its launch was postponed to 4 November 2031. The rated capacity of Riruk-11 is 16.29 ha. The calibration constant filed for Riruk-11 is 57.2443.\n\nAll timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails.\n\nProject Drabri-17 was proposed by Dagny Abubakar on 13 February 2033 with an initial budget of 1,620,025 CAD. On 7 April 2033 the budget of Drabri-17 was revised to 1,831,595 CAD. The approved decision for Drabri-17 was recorded on 5 June 2033. The site of Drabri-17 is Lot 191-F in Baie-Comeau. The supplier identifier for Drabri-17 is DT-10Q-1488. Drabri-17 was cancelled; it was not postponed. The rated capacity of Drabri-17 is 42.1 t. The calibration constant filed for Drabri-17 is 38.7876.\n\nEnvironmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one.\n\nProject Ardtek-12 was proposed by Priyamvada Achterberg on 1 March 2032 with an initial budget of 8,437,475 CHF. The rejected decision for Ardtek-12 was recorded on 8 March 2032. The site of Ardtek-12 is Lot 983-P in Mont-Laurier. The supplier identifier for Ardtek-12 is JS-65C-5324. Ardtek-12 remains on schedule and was neither cancelled nor postponed. The rated capacity of Ardtek-12 is 40.6 MW. The calibration constant filed for Ardtek-12 is 81.0339.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end.\n\nProject Novnovnov-16 was proposed by Bohdan Obuya on 27 December 2034 with an initial budget of 7,928,430 CAD. The rejected decision for Novnovnov-16 was recorded on 8 January 2035. The site of Novnovnov-16 is Lot 70-G in Val-d'Or. The supplier identifier for Novnovnov-16 is YC-30T-7120. Novnovnov-16 was NOT cancelled; its launch was postponed to 21 December 2035. The rated capacity of Novnovnov-16 is 19.2 MW. The calibration constant filed for Novnovnov-16 is 24.9301.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Environmental monitoring reports are archived by the records office for a period of seven years. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office.\n\nProject Talpratal-10 was proposed by Milos Kirchhoff on 19 February 2029 with an initial budget of 5,310,050 USD. The approved decision for Talpratal-10 was recorded on 27 February 2029. The site of Talpratal-10 is Lot 843-Z in Senneterre. The supplier identifier for Talpratal-10 is CQ-19M-8026. Talpratal-10 remains on schedule and was neither cancelled nor postponed. The rated capacity of Talpratal-10 is 46.3 t. The calibration constant filed for Talpratal-10 is 40.2091.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site.\n\nProject Wenaldvar-7 was proposed by Solveig Lindqvist on 8 July 2030 with an initial budget of 8,027,162 CAD. On 16 September 2030 the budget of Wenaldvar-7 was revised to 7,219,915 CAD. On 25 September 2030 the budget of Wenaldvar-7 was revised to 8,870,060 CAD. The approved decision for Wenaldvar-7 was recorded on 19 November 2030. The site of Wenaldvar-7 is Lot 846-S in Gaspé. The supplier identifier for Wenaldvar-7 is NV-92L-2585. Wenaldvar-7 remains on schedule and was neither cancelled nor postponed. The rated capacity of Wenaldvar-7 is 4.36 km. The calibration constant filed for Wenaldvar-7 is 64.7715.\n\nTravel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting.",6  "char_len": 7524,7  "document_hash": "d2491d5f844feb63f313eeffaf204fa21f9681c9544a158e16d409e14e731760",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Riruk-11?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Drabri-17? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Talpratal-10? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Novnovnov-16? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CAD, of the project proposed by Solveig Lindqvist?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 983-P in Mont-Laurier?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Novnovnov-16 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Drabri-17 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Wenaldvar-7, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Wenaldvar-7, in CAD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Riruk-11 or the one for Drabri-17? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Riruk-11 expressed in m²? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Riruk-14? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · 53ae960640251cd8de4e48bd47b17d011ba87dbe
Menu

Theme