SPB Git

spb/wp30_uqo

Public
10.0 KB · 85 lines json
1{2  "document_id": "syn_01018_2000",3  "family": "synthetic",4  "split": "train",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 231. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Ardquiri-23, Aldaldvol-4, Kobri-6.\n\nProject Ardquiri-19 was proposed by Haruki Dubrovnik on 24 April 2031 with an initial budget of 3,314,825 CAD. On 28 May 2031 the budget of Ardquiri-19 was revised to 3,672,600 CAD. On 16 September 2031 the budget of Ardquiri-19 was revised to 2,853,330 CAD. The rejected decision for Ardquiri-19 was recorded on 3 November 2031. The site of Ardquiri-19 is Lot 618-Z in Val-d'Or. The supplier identifier for Ardquiri-19 is MD-35B-6212. Ardquiri-19 was NOT cancelled; its launch was postponed to 2 March 2032. The rated capacity of Ardquiri-19 is 28.3 km. The calibration constant filed for Ardquiri-19 is 61.8729.\n\nProcurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Site access badges must be renewed annually and returned on project completion.\n\nProject Aldaldvol-1 was proposed by Tarek Achterberg on 2 March 2031 with an initial budget of 5,906,909 CAD. On 22 May 2031 the budget of Aldaldvol-1 was revised to 5,754,670 CAD. The approved decision for Aldaldvol-1 was recorded on 6 June 2031. The site of Aldaldvol-1 is Lot 509-G in Chibougamau. The supplier identifier for Aldaldvol-1 is UG-90R-5736. Aldaldvol-1 remains on schedule and was neither cancelled nor postponed. The rated capacity of Aldaldvol-1 is 8.1 ha. The calibration constant filed for Aldaldvol-1 is 47.9842.\n\nTravel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting.\n\nProject Kobri-4 was proposed by Casimir Mbeki on 24 January 2034 with an initial budget of 8,334,854 CAD. On 7 March 2034 the budget of Kobri-4 was revised to 8,071,535 CAD. On 12 April 2034 the budget of Kobri-4 was revised to 9,731,195 CAD. The approved decision for Kobri-4 was recorded on 18 May 2034. The site of Kobri-4 is Lot 916-C in Matagami. The supplier identifier for Kobri-4 is CK-10S-7210. Kobri-4 was cancelled; it was not postponed. The rated capacity of Kobri-4 is 36.0 MW. The calibration constant filed for Kobri-4 is 26.1821.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting.\n\nProject Britis-7 was proposed by Casimir Qvistrand on 9 April 2034 with an initial budget of 7,411,940 CAD. On 4 August 2034 the budget of Britis-7 was revised to 8,169,000 CAD. On 5 November 2034 the budget of Britis-7 was revised to 6,393,375 CAD. The rejected decision for Britis-7 was recorded on 21 November 2034. The site of Britis-7 is Lot 164-W in Mont-Laurier. The supplier identifier for Britis-7 is QC-96H-1067. Britis-7 was NOT cancelled; its launch was postponed to 23 December 2035. The rated capacity of Britis-7 is 4.4 ha. The calibration constant filed for Britis-7 is 81.3199.\n\nAll timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years. Project codes follow the pattern of a name, a hyphen and a sequence number.\n\nProject Quimunvar-5 was proposed by Aurelio Nwachukwu on 6 November 2031 with an initial budget of 3,828,526 CAD. On 16 December 2031 the budget of Quimunvar-5 was revised to 3,298,535 CAD. The approved decision for Quimunvar-5 was recorded on 13 January 2032. The site of Quimunvar-5 is Lot 597-N in Matagami. The supplier identifier for Quimunvar-5 is ES-65N-1275. Quimunvar-5 remains on schedule and was neither cancelled nor postponed. The rated capacity of Quimunvar-5 is 17.1 ha. The calibration constant filed for Quimunvar-5 is 47.1694.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated.\n\nProject Quiardmel-2 was proposed by Bohdan Haldorsen on 28 February 2030 with an initial budget of 3,735,180 CAD. The approved decision for Quiardmel-2 was recorded on 13 April 2030. The site of Quiardmel-2 is Lot 915-E in Gaspé. The supplier identifier for Quiardmel-2 is ER-82X-6551. Quiardmel-2 remains on schedule and was neither cancelled nor postponed. The rated capacity of Quiardmel-2 is 16.0 ha. The calibration constant filed for Quiardmel-2 is 6.8445.\n\nTravel reimbursements require original receipts and a signed itinerary. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.",6  "char_len": 7274,7  "document_hash": "e0ec112e4518262cf87c73e45bc8276b1e6bebafad1498dac1e62fd92ca3a2d2",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Britis-7?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Quiardmel-2? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Ardquiri-19? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Quimunvar-5? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CAD, of the project proposed by Tarek Achterberg?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 916-C in Matagami?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Ardquiri-19 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Kobri-4 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Britis-7, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Ardquiri-19, in CAD? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Britis-7 or the one for Quiardmel-2? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Britis-7 expressed in m²? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Ardquiri-23? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · main
Menu

Theme