SPB Git

spb/wp30_uqo

Public
60.1 KB · 85 lines json
1{2  "document_id": "syn_02026_16000",3  "family": "synthetic",4  "split": "dev",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 712. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Kerymi-22, Eshpra-13, Solnov-9.\n\nProject Kerymi-17 was proposed by Oksana Baptiste-Roy on 8 February 2034 with an initial budget of 9,517,510 EUR. On 22 May 2034 the budget of Kerymi-17 was revised to 10,453,140 EUR. On 24 July 2034 the budget of Kerymi-17 was revised to 8,626,445 EUR. The approved decision for Kerymi-17 was recorded on 4 September 2034. The site of Kerymi-17 is Lot 366-N in Gaspé. The supplier identifier for Kerymi-17 is NZ-75W-2250. Kerymi-17 was cancelled; it was not postponed. The rated capacity of Kerymi-17 is 21.8 MW. The calibration constant filed for Kerymi-17 is 71.8650.\n\nVendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. The internal audit function reports to the governance board and not to project leads. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Environmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Procurement follows the standard three-quote rule for purchases above the departmental threshold.\n\nProject Eshpra-10 was proposed by Casimir Tremblay-Côté on 21 March 2032 with an initial budget of 9,867,555 NOK. On 13 May 2032 the budget of Eshpra-10 was revised to 9,729,270 NOK. On 31 May 2032 the budget of Eshpra-10 was revised to 9,507,965 NOK. The approved decision for Eshpra-10 was recorded on 10 July 2032. The site of Eshpra-10 is Lot 540-A in Amos. The supplier identifier for Eshpra-10 is HE-16Y-9572. Eshpra-10 was NOT cancelled; its launch was postponed to 12 June 2033. The rated capacity of Eshpra-10 is 19.35 ha. The calibration constant filed for Eshpra-10 is 87.9088.\n\nPrinted copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Health and safety briefings are mandatory for all visitors before entering an active site. Minutes are circulated within five business days and approved at the following meeting. Environmental monitoring reports are archived by the records office for a period of seven years. Minutes are circulated within five business days and approved at the following meeting. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Environmental monitoring reports are archived by the records office for a period of seven years. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Minutes are circulated within five business days and approved at the following meeting. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Travel reimbursements require original receipts and a signed itinerary. Capital expenditure is tracked separately from operating costs in the ledger system. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Printed copies of this memo are uncontrolled; the electronic record prevails. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Contingency reserves may only be released with written approval from the finance director. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Travel reimbursements require original receipts and a signed itinerary. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Travel reimbursements require original receipts and a signed itinerary. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Minutes are circulated within five business days and approved at the following meeting. Minutes are circulated within five business days and approved at the following meeting.\n\nProject Solnov-5 was proposed by Nnamdi Baptiste-Roy on 28 April 2032 with an initial budget of 2,227,025 CAD. On 30 July 2032 the budget of Solnov-5 was revised to 2,202,495 CAD. On 14 October 2032 the budget of Solnov-5 was revised to 2,027,395 CAD. The approved decision for Solnov-5 was recorded on 11 November 2032. The site of Solnov-5 is Lot 19-B in Fermont. The supplier identifier for Solnov-5 is WV-68S-9020. Solnov-5 was NOT cancelled; its launch was postponed to 24 August 2033. The rated capacity of Solnov-5 is 38.71 ha. The calibration constant filed for Solnov-5 is 36.2737.\n\nMinutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Environmental monitoring reports are archived by the records office for a period of seven years. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Minutes are circulated within five business days and approved at the following meeting. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Contingency reserves may only be released with written approval from the finance director. Health and safety briefings are mandatory for all visitors before entering an active site. Site access badges must be renewed annually and returned on project completion. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary. All timestamps in this ledger are recorded in local time at the head office. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Health and safety briefings are mandatory for all visitors before entering an active site. Environmental monitoring reports are archived by the records office for a period of seven years. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Contingency reserves may only be released with written approval from the finance director. Site access badges must be renewed annually and returned on project completion. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. All timestamps in this ledger are recorded in local time at the head office. Travel reimbursements require original receipts and a signed itinerary.\n\nProject Volald-15 was proposed by Ingrid Ishikawa on 26 August 2033 with an initial budget of 7,465,150 CHF. The approved decision for Volald-15 was recorded on 21 October 2033. The site of Volald-15 is Lot 282-T in Rouyn-Noranda. The supplier identifier for Volald-15 is DG-62E-8362. Volald-15 was NOT cancelled; its launch was postponed to 2 July 2034. The rated capacity of Volald-15 is 22.0 t. The calibration constant filed for Volald-15 is 90.8151.\n\nHealth and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. The internal audit function reports to the governance board and not to project leads. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Minutes are circulated within five business days and approved at the following meeting. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Project codes follow the pattern of a name, a hyphen and a sequence number. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Printed copies of this memo are uncontrolled; the electronic record prevails. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Health and safety briefings are mandatory for all visitors before entering an active site. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Health and safety briefings are mandatory for all visitors before entering an active site. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. Travel reimbursements require original receipts and a signed itinerary. The internal audit function reports to the governance board and not to project leads. All timestamps in this ledger are recorded in local time at the head office. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. The internal audit function reports to the governance board and not to project leads. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Site access badges must be renewed annually and returned on project completion. Travel reimbursements require original receipts and a signed itinerary. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Travel reimbursements require original receipts and a signed itinerary.\n\nProject Varbri-19 was proposed by Casimir Mbeki on 20 February 2033 with an initial budget of 3,515,171 NOK. The approved decision for Varbri-19 was recorded on 12 April 2033. The site of Varbri-19 is Lot 747-E in Baie-Comeau. The supplier identifier for Varbri-19 is HR-85E-9269. Varbri-19 was cancelled; it was not postponed. The rated capacity of Varbri-19 is 7.77 t. The calibration constant filed for Varbri-19 is 29.4867.\n\nProject codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Travel reimbursements require original receipts and a signed itinerary. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Printed copies of this memo are uncontrolled; the electronic record prevails. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. All timestamps in this ledger are recorded in local time at the head office. Health and safety briefings are mandatory for all visitors before entering an active site. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. The internal audit function reports to the governance board and not to project leads. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Minutes are circulated within five business days and approved at the following meeting. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The internal audit function reports to the governance board and not to project leads. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Site access badges must be renewed annually and returned on project completion. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. The internal audit function reports to the governance board and not to project leads. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Project codes follow the pattern of a name, a hyphen and a sequence number. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Travel reimbursements require original receipts and a signed itinerary. Environmental monitoring reports are archived by the records office for a period of seven years. Travel reimbursements require original receipts and a signed itinerary. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Project codes follow the pattern of a name, a hyphen and a sequence number. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. All timestamps in this ledger are recorded in local time at the head office. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Travel reimbursements require original receipts and a signed itinerary. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years. Contingency reserves may only be released with written approval from the finance director.\n\nProject Urbanlun-17 was proposed by Lorcan Mäkelä on 26 July 2032 with an initial budget of 2,672,025 CHF. On 3 August 2032 the budget of Urbanlun-17 was revised to 3,113,380 CHF. On 28 September 2032 the budget of Urbanlun-17 was revised to 3,045,030 CHF. The rejected decision for Urbanlun-17 was recorded on 4 October 2032. The site of Urbanlun-17 is Lot 519-S in Amos. The supplier identifier for Urbanlun-17 is VF-29U-9513. Urbanlun-17 was NOT cancelled; its launch was postponed to 16 November 2032. The rated capacity of Urbanlun-17 is 24.69 MW. The calibration constant filed for Urbanlun-17 is 21.2846.\n\nQuarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Environmental monitoring reports are archived by the records office for a period of seven years. Health and safety briefings are mandatory for all visitors before entering an active site. Travel reimbursements require original receipts and a signed itinerary. Minutes are circulated within five business days and approved at the following meeting. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. Printed copies of this memo are uncontrolled; the electronic record prevails. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Contingency reserves may only be released with written approval from the finance director. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. The internal audit function reports to the governance board and not to project leads. Contingency reserves may only be released with written approval from the finance director. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Project codes follow the pattern of a name, a hyphen and a sequence number. Travel reimbursements require original receipts and a signed itinerary. Minutes are circulated within five business days and approved at the following meeting. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Health and safety briefings are mandatory for all visitors before entering an active site. All timestamps in this ledger are recorded in local time at the head office. Printed copies of this memo are uncontrolled; the electronic record prevails. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Capital expenditure is tracked separately from operating costs in the ledger system. Site access badges must be renewed annually and returned on project completion. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system. The internal audit function reports to the governance board and not to project leads. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. Project codes follow the pattern of a name, a hyphen and a sequence number. Contingency reserves may only be released with written approval from the finance director. Environmental monitoring reports are archived by the records office for a period of seven years. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. The internal audit function reports to the governance board and not to project leads. Procurement follows the standard three-quote rule for purchases above the departmental threshold. All timestamps in this ledger are recorded in local time at the head office. Site access badges must be renewed annually and returned on project completion. All timestamps in this ledger are recorded in local time at the head office. Capital expenditure is tracked separately from operating costs in the ledger system. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. Site access badges must be renewed annually and returned on project completion. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Environmental monitoring reports are archived by the records office for a period of seven years. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Capital expenditure is tracked separately from operating costs in the ledger system. Project codes follow the pattern of a name, a hyphen and a sequence number. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Minutes are circulated within five business days and approved at the following meeting. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. Quarterly reviews are held on the second Tuesday of the month following the quarter end. All timestamps in this ledger are recorded in local time at the head office. The internal audit function reports to the governance board and not to project leads. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Minutes are circulated within five business days and approved at the following meeting. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Capital expenditure is tracked separately from operating costs in the ledger system. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Project codes follow the pattern of a name, a hyphen and a sequence number. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Printed copies of this memo are uncontrolled; the electronic record prevails. Contingency reserves may only be released with written approval from the finance director. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Project codes follow the pattern of a name, a hyphen and a sequence number. Site access badges must be renewed annually and returned on project completion.",6  "char_len": 58617,7  "document_hash": "0fb8eaf7219d87f81320e7d5990d24d18320c61bf8772f060cc1c31dcd2babb9",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Volald-15?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Kerymi-17? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Solnov-5? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Varbri-19? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in CHF, of the project proposed by Lorcan Mäkelä?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 540-A in Amos?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Volald-15 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Varbri-19 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Solnov-5, in CAD? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Eshpra-10, in NOK? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Volald-15 or the one for Kerymi-17? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in NOK? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Volald-15 expressed in kg? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Kerymi-22? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · main
Menu

Theme