SPB Git

spb/wp30_uqo

Public
10.1 KB · 85 lines json
1{2  "document_id": "syn_03009_2000",3  "family": "synthetic",4  "split": "test",5  "text": "INTERNAL LEDGER MEMO — Capital Projects Register, issue 914. Where two entries conflict, the entry with the later date supersedes the earlier one. Projects listed under 'proposals under review' have no recorded attributes in this issue.\n\nProposals under review (no attributes recorded): Obytorard-11, Felker-18, Eshgamgam-15.\n\nProject Obytorard-10 was proposed by Casimir Dubrovnik on 2 December 2032 with an initial budget of 4,670,383 NOK. The rejected decision for Obytorard-10 was recorded on 17 January 2033. The site of Obytorard-10 is Lot 432-B in Gaspé. The supplier identifier for Obytorard-10 is ZN-56T-7644. Obytorard-10 remains on schedule and was neither cancelled nor postponed. The rated capacity of Obytorard-10 is 30.3 ha. The calibration constant filed for Obytorard-10 is 1.5999.\n\nTravel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Printed copies of this memo are uncontrolled; the electronic record prevails. Where two entries conflict, the entry with the later timestamp supersedes the earlier one. Quarterly reviews are held on the second Tuesday of the month following the quarter end. The committee reiterates that all figures are reported in nominal terms unless otherwise stated. Environmental monitoring reports are archived by the records office for a period of seven years.\n\nProject Felker-16 was proposed by Idris Bergström on 3 November 2032 with an initial budget of 5,247,196 CAD. On 10 November 2032 the budget of Felker-16 was revised to 5,134,740 CAD. On 29 January 2033 the budget of Felker-16 was revised to 4,932,140 CAD. The rejected decision for Felker-16 was recorded on 24 February 2033. The site of Felker-16 is Lot 569-Z in Mont-Laurier. The supplier identifier for Felker-16 is FG-98X-1615. Felker-16 was NOT cancelled; its launch was postponed to 7 December 2033. The rated capacity of Felker-16 is 20.9 MW. The calibration constant filed for Felker-16 is 33.5704.\n\nTravel reimbursements require original receipts and a signed itinerary. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Contingency reserves may only be released with written approval from the finance director. Minutes are circulated within five business days and approved at the following meeting. Environmental monitoring reports are archived by the records office for a period of seven years. Capital expenditure is tracked separately from operating costs in the ledger system.\n\nProject Eshgamgam-11 was proposed by Milos Lindqvist on 1 September 2032 with an initial budget of 9,354,593 CHF. On 12 December 2032 the budget of Eshgamgam-11 was revised to 8,227,110 CHF. On 27 January 2033 the budget of Eshgamgam-11 was revised to 10,047,105 CHF. The rejected decision for Eshgamgam-11 was recorded on 9 March 2033. The site of Eshgamgam-11 is Lot 283-R in Senneterre. The supplier identifier for Eshgamgam-11 is PA-37F-6227. Eshgamgam-11 was NOT cancelled; its launch was postponed to 25 January 2034. The rated capacity of Eshgamgam-11 is 22.2 t. The calibration constant filed for Eshgamgam-11 is 70.3074.\n\nTravel reimbursements require original receipts and a signed itinerary. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Site access badges must be renewed annually and returned on project completion. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. Project codes follow the pattern of a name, a hyphen and a sequence number. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Melardko-3 was proposed by Lorcan Tremblay-Côté on 12 March 2033 with an initial budget of 8,497,835 CAD. On 28 May 2033 the budget of Melardko-3 was revised to 7,776,420 CAD. The approved decision for Melardko-3 was recorded on 6 June 2033. The site of Melardko-3 is Lot 996-B in Chibougamau. The supplier identifier for Melardko-3 is GY-60C-8075. Melardko-3 remains on schedule and was neither cancelled nor postponed. The rated capacity of Melardko-3 is 16.18 km. The calibration constant filed for Melardko-3 is 32.8676.\n\nMinutes are circulated within five business days and approved at the following meeting. Capital expenditure is tracked separately from operating costs in the ledger system. Capital expenditure is tracked separately from operating costs in the ledger system. Environmental monitoring reports are archived by the records office for a period of seven years. Printed copies of this memo are uncontrolled; the electronic record prevails. Printed copies of this memo are uncontrolled; the electronic record prevails. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter.\n\nProject Wenvolqui-4 was proposed by Haruki Zelenko on 28 March 2030 with an initial budget of 571,540 CAD. On 13 May 2030 the budget of Wenvolqui-4 was revised to 527,560 CAD. On 26 August 2030 the budget of Wenvolqui-4 was revised to 548,375 CAD. The approved decision for Wenvolqui-4 was recorded on 23 September 2030. The site of Wenvolqui-4 is Lot 576-S in Chibougamau. The supplier identifier for Wenvolqui-4 is NA-58Q-5913. Wenvolqui-4 was NOT cancelled; its launch was postponed to 25 May 2031. The rated capacity of Wenvolqui-4 is 7.57 MW. The calibration constant filed for Wenvolqui-4 is 15.5999.\n\nThe committee reiterates that all figures are reported in nominal terms unless otherwise stated. Site access badges must be renewed annually and returned on project completion. Contingency reserves may only be released with written approval from the finance director. All timestamps in this ledger are recorded in local time at the head office. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Environmental monitoring reports are archived by the records office for a period of seven years. Quarterly reviews are held on the second Tuesday of the month following the quarter end.\n\nProject Koluntek-19 was proposed by Solveig Ouellet-Marchand on 11 August 2032 with an initial budget of 5,329,886 EUR. The approved decision for Koluntek-19 was recorded on 11 September 2032. The site of Koluntek-19 is Lot 94-V in Mont-Laurier. The supplier identifier for Koluntek-19 is MN-73S-3245. Koluntek-19 was NOT cancelled; its launch was postponed to 27 October 2032. The rated capacity of Koluntek-19 is 28.1 ha. The calibration constant filed for Koluntek-19 is 95.2340.\n\nQuarterly reviews are held on the second Tuesday of the month following the quarter end. Procurement follows the standard three-quote rule for purchases above the departmental threshold. Vendor onboarding includes a conflict-of-interest declaration and a bank verification letter. All timestamps in this ledger are recorded in local time at the head office. Quarterly reviews are held on the second Tuesday of the month following the quarter end. Procurement follows the standard three-quote rule for purchases above the departmental threshold. The internal audit function reports to the governance board and not to project leads.",6  "char_len": 7372,7  "document_hash": "6ed94dcf728255bd7a7d11c97c362930728fb81a3e91f1906eb6eec86e0fedb7",8  "questions": [9    {10      "question_id": "q00_single_fact",11      "qtype": "single_fact",12      "question": "What is the supplier identifier for Eshgamgam-11?"13    },14    {15      "question_id": "q01_single_fact",16      "qtype": "single_fact",17      "question": "Where is the site of Koluntek-19? Give the lot and the town."18    },19    {20      "question_id": "q02_exact_copy",21      "qtype": "exact_copy",22      "question": "What is the calibration constant filed for Melardko-3? Copy it exactly."23    },24    {25      "question_id": "q03_exact_copy",26      "qtype": "exact_copy",27      "question": "Who proposed Felker-16? Give the full name."28    },29    {30      "question_id": "q04_multi_hop",31      "qtype": "multi_hop",32      "question": "What was the initial budget, in NOK, of the project proposed by Casimir Dubrovnik?"33    },34    {35      "question_id": "q05_multi_hop",36      "qtype": "multi_hop",37      "question": "What is the supplier identifier of the project whose site is Lot 576-S in Chibougamau?"38    },39    {40      "question_id": "q06_negation",41      "qtype": "negation",42      "question": "Was Wenvolqui-4 cancelled? Answer yes or no."43    },44    {45      "question_id": "q07_negation",46      "qtype": "negation",47      "question": "Was Melardko-3 postponed? Answer yes or no."48    },49    {50      "question_id": "q08_revision",51      "qtype": "revision",52      "question": "According to the ledger's precedence rule, what is the current budget of Eshgamgam-11, in CHF? Give the number only."53    },54    {55      "question_id": "q09_revision",56      "qtype": "revision",57      "question": "What was the first revised budget of Eshgamgam-11, in CHF? Give the number only."58    },59    {60      "question_id": "q10_temporal",61      "qtype": "temporal",62      "question": "Which decision was recorded first: the one for Eshgamgam-11 or the one for Koluntek-19? Answer with the project code."63    },64    {65      "question_id": "q11_aggregation",66      "qtype": "aggregation",67      "question": "What is the total of the initial budgets of all projects whose budget is denominated in CAD? Give the number only."68    },69    {70      "question_id": "q12_unit_conversion",71      "qtype": "unit_conversion",72      "question": "What is the rated capacity of Eshgamgam-11 expressed in kg? Give the number only."73    },74    {75      "question_id": "q13_unanswerable",76      "qtype": "unanswerable",77      "question": "What is the supplier identifier for Obytorard-11? If the document does not say, answer exactly: unknown."78    },79    {80      "question_id": "q14_unanswerable",81      "qtype": "unanswerable",82      "question": "What is the postal code of the head office that issued this ledger? If the document does not say, answer exactly: unknown."83    }84  ]85}
Files · main
Menu

Theme