-
Fri, Oct 30, 2026 2
-
WP30: E3 transfer complete, all results sections, abstract, conclusion, claim ledger, FINAL_REPORT draft, page inspection
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
WP30: E6 two-node core measured (324 runs), analysis/break-even figure, network results section, collection scripts
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
-
Thu, Oct 29, 2026 2
-
WP30: runner, chains, fan-in, transport, smoke runs (Qwen, Llama), pilot plan
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
WP30: harness scaffold, cache adapters, datasets, literature audit
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-