-
Fri, Oct 30, 2026 4
-
WP30: final analysis (E7 exploratory), paper layout pass, FINAL_REPORT, index updates
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
WP30: E3 transfer complete, all results sections, abstract, conclusion, claim ledger, FINAL_REPORT draft, page inspection
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
WP30: E4 chains (7,200 trials) and E5 fan-in (1,600) complete, results sections for handoffs/fan-in/hosted/network/frontier/router, figure fixes
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-
WP30: paper sections (intro, related, formulation, methods, protocol, appendix), router eval, mapper v2, pilots on cluster
…
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
-