phase4: checkpoint — token system complete, CLAUDE.md §4 locked as Phase 6 UI contract
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Showing 1 changed file with +5 and −0
modified
docs/PLAN.md
+5 −0
@@ -29,6 +29,11 @@ | ||
| 29 | 29 | **Phase 3 checkpoint (2026-07-30):** Engine complete and proven live. Build 0 warnings; policy self-check 38/38; safety contract demonstrated against a real model (deny path AND happy path). ~/zqtest cleaned up after verification. |
| 30 | 30 | |
| 31 | 31 | ## Phase 4 — Design system & UI spec (ZyquoTheme violet) |
| 32 | +- [x] ZyquoTheme tokens implemented 1:1 from the CLAUDE.md §4.1 table (violet #7A5AF0 flagship light theme; plum-charcoal dark derived; type/spacing/radii/metrics/motion per family standard; Agent metrics: 1320×860 default, 300pt plan panel, 760×560 settings) | |
| 33 | +- [x] Components (hover/press/badges/status dots/provider glyphs) + AppearanceStore (violet default; graphite/sky/emerald/amber alternates) | |
| 34 | +- Post-Phase-3 coherence sweep: headers 100%, no naming drift, no Cloud identifier leftovers | |
| 35 | + | |
| 36 | +**Phase 4 checkpoint (2026-07-30):** CLAUDE.md §4.2–4.4 is the binding UI contract for Phase 6 (command-center layout: 260pt sidebar / 760pt conversation column with AgentStep cards + approval cards / collapsible plan panel / terminal drawer with Live-Audit-Files tabs / 52pt header with safety-mode segmented control). Design quality gate runs at the end of Phase 6. | |
| 32 | 37 | |
| 33 | 38 | ## Phase 5 — Icon (SVG → icns) |
| 34 | 39 | |
| 35 | 40 | |