spb/datacenterindex
Public
HTML 53.9%
TypeScript 44.5%
JavaScript 0.6%
SQL 0.5%
1{2 "url": "https://www.nextdc.com/data-centres/perth-data-centres/p2-perth",3 "documentId": "doc_10f36a288aedf0b3",4 "fetchedAt": "2026-09-11T08:31:56.476Z",5 "contentType": "text/html; charset=UTF-8",6 "note": "Same stat block as B2 but '20MW+ IT Capacity': the trailing '+' (an 'at least' figure) is accepted by the stat regex since 2026-09-12 and parsed as the stated 20 MW. 12,000 m², 6,300 racks, Tier IV.",7 "counts": {8 "facility": 19 },10 "facilities": [11 {12 "key": "nextdc:p2",13 "name": "NEXTDC P2 Perth",14 "operatorName": "NEXTDC",15 "city": "Perth",16 "countryIso2": "AU",17 "itCapacityMw": 20,18 "buildingSqm": 12000,19 "rackCount": 6300,20 "tier": "Tier IV"21 }22 ]23}24