SPB Git forge
38commits 1branches 0releases
338.7 MBsize
maindefault branch
3 h agolast push
HTML 53.9% TypeScript 44.5% JavaScript 0.6% SQL 0.5%
2.1 KB

# CRU Ireland — news (cru-ie)

kind / priority government / 2
config config/connectors/cru-ie.yaml
parser news_article_v1 — see docs/PROJECT-EXTRACTION.md
schedule daily (sitemap + news pages)
license / attribution Public sector information (Commission for Regulation of Utilities, Ireland); facts and links only — "Commission for Regulation of Utilities (cru.ie)"
stored per item text kept (keepText: true)

# What it is

News of the Irish energy regulator (CRU), the body that sets the grid-connection rules for Large Energy Users — i.e. data centres — in Ireland: New Electricity Connection Policy for Data Centres (proposed decision, 2025-02-18), Large Energy User connections policy consultation and workshops (2024), Enduring Connection Policy ECP-24, National Energy Demand Strategy. 135 news pages at /about-us/news/<slug>/, discovered from /sitemap.xml (11 487 URLs, filtered by include).

# Quirks

  • The news index is client-rendered (no anchors in the HTML) and there is no RSS → sitemap discovery. Every sitemap lastmod carries the same build timestamp, so it gives no freshness signal; change detection relies on content hashes.
  • robots.txt disallows /publications/ (decision papers, PDFs) — excluded; only the news pages are fetched. The Irish-language mirror /ga/ is excluded.
  • Pages are server-rendered; the date is a <time> element ("15th January 2024") caught by the dateline fallback (text:dateline).
  • Most CRU news (customer protection, supplier exits, water) is not about data centres and yields nothing; the connection-policy items are the payload.

# Verification

Verified live on 2026-09-12 with scripts/try-connector.ts (dry run, nothing persisted): sitemap 11 487 URLs → 135 news URLs discovered, 5 fetched at L1 (0 credits; the first five in sitemap order are customer-protection items → 0 events, 0 errors). --url on New Electricity Connection Policy for Data Centres → 1 news_event dated 2025-02-18 (power_infrastructure / power_agreement, project class GRID_CONNECTION, country IE), 0 errors.