PROGRESS.md — WP39 wp39_uqo
Phase 0 — Discovery and feasibility (2026-11-02) — GATE PASSED
- Inspected the UQO Research workspace (
Recherche-UQO/, 39 papers, harmonisation standard); nowp39existed; createdfinance/invisible-balance-sheet/from the template; git initialised on a dedicated repository (no other paper touched). - Probed FinData:
/healthok, 64 datasets, OpenAPI 3.1 (45 routes), bars schema v1, fundamentals (67 metrics, 5,451 entities, 2012→2026), earnings events (Postgres), coverage endpoints, export throughput (≈ 1 s per symbol-decade; 12-year cap per request). Created least-privilege keywp39_uqo. - Verified external public sources: SEC
company_tickers.json+submissions(CIK/SIC), Kenneth French daily factors. - Verified 94 bibliography entries on Crossref; wrote
docs/NOVELTY_MEMO.md,literature/RELATED_WORK_MATRIX.csv. - Outputs:
DATA_AUDIT.md(viability = YES with survivorship + PIT caveats),configs/*.yaml,docs/API_INTEGRATION.md,docs/COMPUTE_BUDGET.md,docs/PIT_PROTOCOL.md,docs/RESEARCH_DESIGN.md(frozen),DECISIONS.mdD-001…D-010. - Owner instructions received during the session: (1) the fundamentals API must be used — it is the accounting source; (2) minimise AI usage — no LLM features, no neural models (D-006).
- Blockers: none. Next safe step: Phase 1 gate memo, then code + tests (Phase 2).
Phase 1 — Research design and novelty — GATE (self-approved under the autonomous mandate, D-010)
docs/RESEARCH_DESIGN.mdfrozen 2026-11-02 14:40 ET; hypotheses H1–H5 with null/alternative, primary endpoint (H1, h = 20, log loss, binary adverse operating-income surprise), decision rules, splits, inference, power plan.- Owner review pending; nothing in Phases 2–5 depends on test-period data until the Phase 3 gate.